Council planning record

Proposed 2.1 metre high garden fence to southern boundary adjacent to Dean Road

46 DEAN ROAD, FAIR OAK, EASTLEIGH, SO50 7JE

Decided PermitReference: H/23/95898Eastleigh Borough Council

Last published check: 3 Oct 2026, 13:02. Check the council record for more recent changes.

Application location

46 DEAN ROAD, FAIR OAK, EASTLEIGH, SO50 7JE

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
25 Aug 2023
Validated
25 Aug 2023
Determination deadline
20 Oct 2023
Local authority
Eastleigh Borough Council

Application overview

Proposed 2.1 metre high garden fence to southern boundary adjacent to Dean Road

Proposal details

Reference
H/23/95898
Alternative references
12404204
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
KF Planning Consultancy (Mrs Kerry Futter)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_23_95898 PL_Final DecisionDecision Notice · PDF18 Oct 2023View
H_23_95898 Delegated Officer ReportOfficer Report · PDF18 Oct 2023View
Fair Oak Parish Council Consultation Response - No objectionConsultation Response · PDF4 Oct 2023View
Southern Water Consultation ResponseConsultee Response · PDF3 Oct 2023View
Additional ecology response for H 23 95898 46 DEAN ROAD, FAIR OAKConsultee Response · PDF2 Oct 2023View
Ecology response for H 23 95898 46 DEAN ROAD, FAIR OAKConsultee Response · PDF19 Sept 2023View
Planning StatementPlanning Statement · PDF25 Aug 2023View
ApplicationFormRedacted.pdfApplication Form · PDF25 Aug 2023View
PL.735.23.01.pdfElevations And Floor Plan · PDF25 Aug 2023View
PL.735.23.02.pdfElevations Plan · PDF25 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95898 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 and 02 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Material Section of the application form and approved drawing PL.735.02 (Proposed Plans and Elevations) Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The hedgerow located along the southern boundary shall be retained to a height of no less than 3m Reason: In the interests of the visual amenity of the locality
  5. Note to Applicant: Biodiversity enhancements have been recommended. Bird boxes such a sparrow terrace or a swift nest box would be appropriate mitigation for loss of this hedgerow. They can be mounted on the house and positioned according to the guidelines below: Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes/26Attraction.htm). Bird nest boxes should also be sheltered from prevailing rain, wind and strong sunlight and it is helpful for there to be a clear flight path to the box. Further information is available on the RSPB website, under wildlife advice, making and placing a bird box. Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31,planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022-03/WAG16/20Bats/20updated/202022/20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help/birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/
  6. Note to Applicant: If hedgehogs are using the site they would be sheltering under dense vegetation or within long grass, dead leaves or piles of dead wood. These areas should be cleared by hand, not using a digger, to allow animals time to escape. Removal of potential habitat must not take place from November through March when animals may be hibernating. No fires can be lit on site. The British Hedgehog Society recommends that Areas should be cleared on rotation with scrubby patches left to provide nesting habitat and cover. If this is not possible, piles of dead wood and brash piles can be created in other areas around the site to mitigate for the removal of suitable nesting sites. These can be created behind hedges or out of the way for smaller developments with limited space. Replacement habitat can include log piles, leaf litter, dead wood and scrub. Hedgehog houses can also be made or purchased: https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/ Hedgehog holes (13 x 13 cm minimum) must be included in the baseboards of any closed board fences to allow the free passage of small mammals through the garden.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.