Council planning record

Installation of an airsource heat pump located to the rear, replacing gas back-boiler.

112 NUTBEEM ROAD, EASTLEIGH, SO50 5JT

Decided PermitReference: H/23/95799Eastleigh Borough Council

Last published check: 3 Oct 2026, 16:41. Check the council record for more recent changes.

Application location

112 NUTBEEM ROAD, EASTLEIGH, SO50 5JT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
8 Aug 2023
Validated
9 Aug 2023
Determination deadline
3 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

Installation of an airsource heat pump located to the rear, replacing gas back-boiler.

Proposal details

Reference
H/23/95799
Alternative references
12366569
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
H_23_95799 PL_Final DecisionDecision Notice · PDF1 Nov 2023View
H_23_95799 Delegated Officer ReportOfficer Report · PDF31 Oct 2023View
Consultation response from Southern WaterConsultation Response · PDF11 Oct 2023View
Proposed Elevation PlanElevations Plan · PDF6 Oct 2023View
Existing Elevation PlanElevations Plan · PDF6 Oct 2023View
Location PlanLocation Plan · PDF8 Aug 2023View
Site Layout PlanSite Layout Plan · PDF8 Aug 2023View
EDLA-04-06-08-Installer reference_part3.pdfReport - Other · PDF8 Aug 2023View
Clearance needed around ASHP.png.pdfOther · PDF8 Aug 2023View
EDLA-04-06-08-Installer reference_part2.pdfReport - Other · PDF8 Aug 2023View
EDLA-04-06-08-Installer reference_part1.pdfReport - Other · PDF8 Aug 2023View
MCS 020 - Noise Assessment - Alistair W so505jt .pdfReport - Noise / Vibration · PDF8 Aug 2023View
ApplicationFormRedacted.pdfApplication Form · PDF8 Aug 2023View
EDLA-04-06-08-Installer reference_part4.pdfReport - Other · PDF8 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95799 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 02, 04, TQRQM23216130006311 and TQRQM23216124843489 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise be in accordance with the following plan numbered: 04. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.