The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC 01 and HCC11/M/040. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
No parking shall start on site until the access, including the footway and/or verge crossing shall be constructed in accordance with the approved plans. Reason - To provide satisfactory access and in the interests of highway safety.
Before parking is commenced on site, provision for parking (minimum 3.0 x 5.0m) shall have been made within the site in accordance with the approved plans and shall be retained thereafter. This should be constructed of a non-migratory bound surface to prevent tracking of loose material onto the highway. Reason - To ensure adequate on-site car parking provision for the approved development
Prior to first use of the development hereby permitted, a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping [including boundary treatments] and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintenance thereafter. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
Note to applicant : The applicant should be made aware that subsequent to any planning permission that may be forthcoming from EBC as Local Planning Authority, a secondary permission will be required from HCC to actually undertake the works. Details of this process can be found via the following web address - https://www.hants.gov.uk/transport/parking/droppedkerbs
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.