Council planning record

First floor side extension above existing garage. Single storey side extension to form porch with associated landscape works

3 AVONBORNE WAY, CHANDLER'S FORD, EASTLEIGH, SO53 1TF

Decided PermitReference: H/23/95691Eastleigh Borough Council

Last published check: 3 Oct 2026, 20:08. Check the council record for more recent changes.

Application location

3 AVONBORNE WAY, CHANDLER'S FORD, EASTLEIGH, SO53 1TF

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
24 Jul 2023
Validated
24 Jul 2023
Determination deadline
2 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

First floor side extension above existing garage. Single storey side extension to form porch with associated landscape works

Proposal details

Reference
H/23/95691
Alternative references
12319407
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
Enzo Design Studio (Mr Martin Andrews)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
H_23_95691 PL_Final DecisionDecision Notice · PDF1 Nov 2023View
H_23_95691 Delegated Officer ReportOfficer Report · PDF30 Oct 2023View
Proposed Floor PlansFloor Plan · PDF24 Jul 2023View
Site Location & Block PlanBlock Plan · PDF24 Jul 2023View
Proposed Site PlanSite Layout Plan · PDF24 Jul 2023View
Existing Site PlanSite Layout Plan · PDF24 Jul 2023View
Proposed Elevation PlansElevations Plan · PDF24 Jul 2023View
Application Form RedactedApplication Form · PDF24 Jul 2023View
Existing Elevation PlansElevations Plan · PDF24 Jul 2023View
Existing Floor PlansFloor Plan · PDF24 Jul 2023View
Location PlanLocation Plan · PDF24 Jul 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95691 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 3PLN_102 Rev P01, 3PLN_201 Rev P01, 1EXG_001 Rev P01, 1EXG_002 Rev P01, 3PLN_101 Rev P01, 1EXG_003 Rev P01 and 1EXG_004 Rev P01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise be in accordance with those in the Application Form. Unless otherwise agreed in writing by the Local Planning Authority, the first-floor side extension hereby permitted shall be constructed using the following material and colour: Dark grey fibre cement cladding Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to Applicant: It is recommended to add a bat brick and a swift brick for this building as biodiversity enhancements. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  6. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.