Council planning record

Erection of single storey rear extension and patio, change of fenestration and internal alterations. Summer house under permitted development.

14 HADRIANS CLOSE, CHANDLER'S FORD, EASTLEIGH, SO53 2AS

Decided PermitReference: H/23/95652Eastleigh Borough Council

Last published check: 3 Oct 2026, 20:51. Check the council record for more recent changes.

Application location

14 HADRIANS CLOSE, CHANDLER'S FORD, EASTLEIGH, SO53 2AS

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
17 Jul 2023
Validated
17 Jul 2023
Determination deadline
11 Sept 2023
Local authority
Eastleigh Borough Council

Application overview

Erection of single storey rear extension and patio, change of fenestration and internal alterations. Summer house under permitted development.

Proposal details

Reference
H/23/95652
Alternative references
12320019
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
H_23_95652 Delegated Officer ReportOfficer Report · PDF7 Sept 2023View
Ecology response amended for H 23 95652 14 HADRIANS CLOSE, CHANDLER'S FORDConsultee Response · PDF7 Sept 2023View
Ecology response for H 23 95652 14 HADRIANS CLOSE, CHANDLER'S FORDConsultee Response · PDF4 Sept 2023View
Existing and Proposed Floor, Elevation, Block and Location PlanPlans · PDF17 Jul 2023View
Application Form RedactedApplication Form · PDF17 Jul 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: HC-23/07/001 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form and approved plan HC-23/07/001 Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  5. Note to Applicant: Breeding bird season is generally between March and August inclusive. Vegetation removal and removal of the shed to facilitate construction must be done outside this time period or only within 24 hours after a nesting bird check by a suitably qualified ecologist. If evidence of an active bird’s nest is found during construction, a 5 m buffer must be erected around the nest to protect it from disturbance until after the chicks have fledged and left the nest.
  6. Note to Applicant: Any hedgehogs found on site must be allowed to move away to a place of safety on their own. Excavations and open pipes must be covered or fitted with a small mammal escape ramp (roughened slanted board) at night.
  7. Note to Applicant: Biodiversity enhancements have been recommended. Built in bat and swift nest bricks/boxes are preferred. Swift boxes can be used by other species if swifts are not using them. Bee bricks, log and brushwood piles and planting native species which produce fruit and seeds for pollinators are also recommended. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.wildaboutgardens.org.uk/sites/default/files/2022- 03/WAG16%20Bats%20updated%202022%20WEB.pdf - Stars of the Night guide to attract bats into your garden https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.