Council planning record

Two storey Rear extension coming out 2.5 metres on the ground floor and only 1.5 metres on the first floor

11 ASHTON GARDENS, EASTLEIGH, SO50 4DF

Decided PermitReference: H/23/95302Eastleigh Borough Council

Last published check: 4 Oct 2026, 06:14. Check the council record for more recent changes.

Application location

11 ASHTON GARDENS, EASTLEIGH, SO50 4DF

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
26 May 2023
Validated
26 May 2023
Determination deadline
21 Jul 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey Rear extension coming out 2.5 metres on the ground floor and only 1.5 metres on the first floor

Proposal details

Reference
H/23/95302
Alternative references
12187598
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
Rosenthal Design Services Ltd (Mr Les Rosenthal)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
H_23_95302 PL_Final DecisionDecision Notice · PDF20 Jul 2023View
H_23_95302 Delegated Officer ReportOfficer Report · PDF19 Jul 2023View
Proposed Elevations PlanElevations Plan · PDF26 May 2023View
Existing GF PlanFloor Plan · PDF26 May 2023View
Proposed FF PlanFloor Plan · PDF26 May 2023View
Existing Elevations PlanElevations Plan · PDF26 May 2023View
Existing FF PlanFloor Plan · PDF26 May 2023View
Application Form RedactedApplication Form · PDF26 May 2023View
Location PlanLocation Plan · PDF26 May 2023View
Proposed GF PlanFloor Plan · PDF26 May 2023View
Location & Block PlanLocation Plan · PDF26 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95302 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 04, 07, Loc 08, 01, 02, 05, 06 and 03 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to Applicant: Any slow worms, reptiles or grass snakes found on site must not be disturbed but should be allowed to move to a place of safety/suitable habitat on their own. All site workers must be made aware of the low likelihood of these species being on site and know what to do if they are found.
  6. Note to Applicant: Biodiversity enhancements will be required. A bat brick/box and a swift brick/nest box may be appropriate for this building. If only one is possible, a swift brick/box is preferred for this site. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  7. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.