Council planning record

Two storey rear extension with rooflights, and alterations to fenestration

233 TWYFORD ROAD, EASTLEIGH, SO50 4HT

Decided PermitReference: H/23/95208Eastleigh Borough Council

Last published check: 4 Oct 2026, 06:12. Check the council record for more recent changes.

Application location

233 TWYFORD ROAD, EASTLEIGH, SO50 4HT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
11 May 2023
Validated
29 May 2023
Determination deadline
24 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey rear extension with rooflights, and alterations to fenestration

Proposal details

Reference
H/23/95208
Alternative references
12150331
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
Parkers Design (Mr Steve Walker)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
H_23_95208 PL_Final DecisionDecision Notice · PDF16 Nov 2023View
H_23_95208 ELAC Committee ReportOfficer Report · PDF15 Nov 2023View
Existing and Proposed 3D Rear and Left ElevationSupporting Documents · PDF29 May 2023View
Existing and Proposed Left and Right ElevationsElevations Plan · PDF29 May 2023View
Existing and Proposed 3D Front and Left ElevationSupporting Documents · PDF29 May 2023View
Existing and Proposed Ground Floor Floor PlanFloor Plan · PDF29 May 2023View
Existing and Proposed Front and Rear ElevationsElevations Plan · PDF29 May 2023View
Existing and Proposed First Floor FloorPlanFloor Plan · PDF29 May 2023View
Existing and Proposed 3D Rear and Right ElevationSupporting Documents · PDF29 May 2023View
Location and Block PlanPlans · PDF29 May 2023View
Existing and Proposed 3D Front and Right ElevationSupporting Documents · PDF29 May 2023View
Application Form RedactedApplication Form · PDF11 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95208 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: P1, P2, P3, P4, P5, P6, P7, P8 and P9 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: Biodiversity enhancements are requested. It is recommended to add a bat brick and a swift brick for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  7. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.