Council planning record

To replace the existing conservatory/rear porch with a new rear conservatory with lean to roof and with cool blue self cleaning glass (Amended ownership certificate)

45 PENSHURST WAY, EASTLEIGH, SO50 4RH

Decided PermitReference: H/23/95203Eastleigh Borough Council

Last published check: 3 Oct 2026, 16:20. Check the council record for more recent changes.

Application location

45 PENSHURST WAY, EASTLEIGH, SO50 4RH

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
10 May 2023
Validated
10 Aug 2023
Determination deadline
2 Nov 2023
Local authority
Eastleigh Borough Council

Application overview

To replace the existing conservatory/rear porch with a new rear conservatory with lean to roof and with cool blue self cleaning glass (Amended ownership certificate)

Proposal details

Reference
H/23/95203
Alternative references
11584516
Ward
Eastleigh North Ward
Parish
Allbrook and North Boyatt CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
H_23_95203 PL_Final DecisionDecision Notice · PDF1 Nov 2023View
H_23_95203 Delegated Officer ReportOfficer Report · PDF31 Oct 2023View
Neighbour Notice Final (1)_RedactedSupporting Documents · PDF6 Oct 2023View
Certificate B Completed_RedactedSupporting Documents · PDF6 Oct 2023View
Site PlanSite Layout Plan · PDF4 Oct 2023View
Existing/Proposed Right Elevations PlansElevations Plan · PDF10 Aug 2023View
Existing/Proposed Rear Elevations PlansElevations Plan · PDF10 Aug 2023View
Existing/Proposed Ground Floor PlansFloor Plan · PDF10 Aug 2023View
Existing/Proposed Roof PlansRoof Plan · PDF10 Aug 2023View
Existing/Proposed Left Slevations PlansElevations Plan · PDF10 Aug 2023View
Application Form RedactedApplication Form · PDF10 May 2023View
Location PlanLocation Plan · PDF10 May 2023View
Plan DrawingPlan10 May 2023View
Technical DetailsSupporting Documents10 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_95203 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: TQRQM23276151304091, LOC 01, 001, 002, 003, 004 and 005 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise be in accordance with those in the Application Form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.