The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC 01, BLOC 01 and 23/309/01 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
No vehicles (including builders and contractors), machinery, equipment, materials, spoil, scaffolding or anything else associated with the works, use, or occupation of the development, shall be left on or near to a Public Right or Way as to cause obstruction, hindrance, or a hazard to the legitimate users. The public retain the right to use the public right of way at all times. Reason: To protect and retain the use of the public right of way
Note to Applicant: General informatives have been advised for the application in regards to the Public Right of Way Network: Nothing connected with the development, or its future use, shall have an adverse effect on the Public Rights of Way, which must always remain available for safe public use at all times.There must be no surface alterations to a Public Right of Way without the consent of Hampshire County Council as Highway Authority. Planning permission under the Town and County Planning Act (1990) does not provide this and separate consent is required. To carry out any such works without this permission would constitute an offence under Section 131 of the Highways Act (1980).No works to the surface of the Public Right of Way shall be carried out without prior approval of the Area Countryside Access Manager. Any damage caused to the surface of the Public Right of Way by construction traffic will be required to be restored to the satisfaction of the Area Countryside Access Manager on the completion of the build.
Note to Applicant: Scottish and Southern Electricity Networks Distribution have issued guidance notes regarding building works. The guidance notes can be found here.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.