Council planning record

Demolition of summer house. Two storey extension to existing annex. First floor extensions over existing annex, connecting to main house.

3 COULTAS ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5BA

Decided PermitReference: H/23/94978Eastleigh Borough Council

Last published check: 7 Oct 2026, 22:06. Check the council record for more recent changes.

Application location

3 COULTAS ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5BA

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
3 Apr 2023
Validated
24 Apr 2023
Determination deadline
31 Jul 2023
Local authority
Eastleigh Borough Council

Application overview

Demolition of summer house. Two storey extension to existing annex. First floor extensions over existing annex, connecting to main house.

Proposal details

Reference
H/23/94978
Alternative references
11944681
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
SC Architecture Ltd (SC Architecture)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
H_23_94978 PL_Final DecisionDecision Notice · PDF24 Jul 2023View
Ecology response for H 23 94978 3 COULTAS ROAD, CHANDLER'S FORDConsultee Response · PDF18 May 2023View
Flood Zones 2 and 3 FormFlood Risk Assessment · PDF24 Apr 2023View
Existing/Proposed Block PlansBack Data Capture · PDF17 Apr 2023View
Existing Floor, Elevations, Site and Location PlansPlans · PDF17 Apr 2023View
Application Form RedactedApplication Form · PDF3 Apr 2023View
Proposed Floor and Elevations PlansPlans · PDF3 Apr 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_94978 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 4468-P-01 Rev B, 4468-P-03 and 4468-P-02 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The development must accord with the arboricultural report reference ‘AIA Coultas Rd Rev A’. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference ‘3 Coultas Rd Tree Protection Plan rev annot’. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  4. No storage of building materials or equipment shall be sited within 20m of the northern boundary of the adjoining the watercourse during the construction period associated with the development hereby permitted. Reason: To prevent sediments/ contaminants from entering the watercourse, to protect the water quality of the watercourse to the north.
  5. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  6. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  9. Note to Applicant The Applicant is advised to enhance biodiversity by installing a bird box and/or bat box to either the host dwellinghouse or approved two-storey side extension. Hampshire Swifts may be able to help with installation of swift nest boxes on the house. Additional information is available at https://www.hampshireswifts.co.uk/.
  10. Note to Applicant: If any vegetation on site is required to be pruned to accommodate the construction works, this must be done outside of nesting bird season (March through to August), or immediately after a check for nesting birds by a suitably qualified ecologist. If any active nests are found in an area which would be impacted by the work, all work must stop immediately. A 5m buffer should then be erected to protect the nest from disturbance until after the chicks have fledged and left the nest.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.