Council planning record

Remodelling of existing bungalow to provide new first floor accommodation. Ground floor extension and reconfiguration, creating a 5no. bedroom property with integral garage (Resubmission F/22/93841)

18 CROWSPORT, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4HG

Decided PermitReference: H/23/94973Eastleigh Borough Council

Last published check: 7 Oct 2026, 23:20. Check the council record for more recent changes.

Application location

18 CROWSPORT, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4HG

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
31 Mar 2023
Validated
20 Apr 2023
Determination deadline
23 Jun 2023
Local authority
Eastleigh Borough Council

Application overview

Remodelling of existing bungalow to provide new first floor accommodation. Ground floor extension and reconfiguration, creating a 5no. bedroom property with integral garage (Resubmission F/22/93841)

Proposal details

Reference
H/23/94973
Alternative references
12062256
Ward
Hamble & Netley Ward
Parish
Hamble-le-Rice CP
Agent
Mr Adi Puplampu

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 36 of 36

DocumentPublishedAction
Obj letter to council from 22 Crowsport · PDF10 Jul 2023View
H_23_94973 PL_Final DecisionDecision Notice · PDF23 Jun 2023View
H_23_94973 Delegated Officer ReportOfficer Report · PDF23 Jun 2023View
AMENDED_Proposed North and West Elevations · PDF23 Jun 2023View
AMENDED_Proposed South and East Elevations · PDF23 Jun 2023View
AMENDED_Proposed Site Plan · PDF22 Jun 2023View
AMENDED_Proposed Site Roof PlanPlan · PDF22 Jun 2023View
Heritage comments · PDF16 May 2023View
Existing Site Survey and Elevations PlansPlans · PDF26 Apr 2023View
Proposed First Floor PlanFloor Plan · PDF20 Apr 2023View
Proposed Ground Floor PlanFloor Plan · PDF20 Apr 2023View
Site Block PlanBlock Plan · PDF13 Apr 2023View
Location PlanLocation Plan · PDF13 Apr 2023View
Existing Ground Floor PlanFloor Plan · PDF13 Apr 2023View
Existing Site PlanSite Layout Plan · PDF13 Apr 2023View
Existing South and East Elevation PlanElevations Plan · PDF31 Mar 2023View
Proposed Northern Contextual Street Scene Elevation PlanElevations Plan · PDF31 Mar 2023View
Existing Overhead Perspective ViewPlan · PDF31 Mar 2023View
SUPERSEDED_Proposed Site Roof PlanRoof Plan · PDF31 Mar 2023View
Existing Site Roof PlanRoof Plan · PDF31 Mar 2023View
Application Form RedactedApplication Form · PDF31 Mar 2023View
Design and Access StatementDesign And Access Statement · PDF31 Mar 2023View
Proposed Western Contextual Street Scene Elevation PlanPlan · PDF31 Mar 2023View
Existing Northern Contextual Street Scene Elevation PlanElevations Plan · PDF31 Mar 2023View
Existing Site PlanSite Layout Plan · PDF31 Mar 2023View
Design and Access StatementDesign And Access Statement · PDF31 Mar 2023View
Proposed Sections AA and BBPlan · PDF31 Mar 2023View
Proposed Overhead Perspective ViewPlan · PDF31 Mar 2023View
SUPERSEDED_Proposed Site PlanSite Layout Plan · PDF31 Mar 2023View
Design and Access StatementDesign And Access Statement · PDF31 Mar 2023View
Arboricultural Constraints AssessmentSupporting Documents · PDF31 Mar 2023View
Existing North and West Elevation PlanElevations Plan · PDF31 Mar 2023View
Design and Access StatementDesign And Access Statement · PDF31 Mar 2023View
SUPERSEDED_Proposed North and West Elevation PlanElevations Plan · PDF31 Mar 2023View
AMENDED_Proposed South and East Elevation PlanElevations Plan · PDF31 Mar 2023View
Existing Western Contextual Street Scene Elevation PlanElevations Plan · PDF31 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_94973 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: P03, P14 Rev B, P13 Rev A, P02, P05 Rev A, P06 Rev A, P00, P17, P21, P07, P20 Rev A, P19, P11 Rev A, P08, P10, P09, P16, P12 Rev A, P15 Rev A, P04, P05 and P18 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The additional ground floor windows on the north and west elevations, as marked on the approved plan P15 Rev B and the additional ground and first floor windows on the south elevation and the additional first floor window on the east elevation, as marked on the approved plan P16 Rev A be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top opening toplight. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties in accordance with local plan policy DM1 of the Eastleigh Borough Local Plan (2021-2036)
  5. No development shall start until details for the sustainable disposal of surface water from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage for the development in accordance with policies DM2, DM3 and DM6 of the Eastleigh Borough Local Plan (2016-2036).
  6. No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping [including trees and boundary treatment] and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents in accordance with policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  7. Note to Applicant: Any trees or shrubs that might support nesting birds must be removed outside of nesting bird season which is from March through August. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works. A precautionary working method statement for hedgehogs will be required. This will include keeping any piles of materials either on hard standing or raised on pallets and avoiding the accumulation of piles of vegetation on site where hedgehogs could shelter under them. Any excavations and open pipes must be covered at night or fitted with small mammal escape ramps (rough slanted boards) to prevent entrapment. No fires should be lit on site. Biodiversity enhancements are required. Bat bricks/boxes and swift bricks/boxes would be appropriate additions to the building. Built-in roost/nest sites are preferable to externally mounted boxes as they do not fall off and do not require maintenance. Landscaping should include flowering and fruiting plants and shrubs rather than conifers. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast, or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  8. "Note to Applicant" In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.