Council planning record

Proposed single storey side extension and single storey link to garage. Alterations to fenestration. (Revision H/21/91468)

8 THE PADDOCK, EASTLEIGH, SO50 4SD

Decided PermitReference: H/23/94958Eastleigh Borough Council

Last published check: 4 Oct 2026, 11:54. Check the council record for more recent changes.

Application location

8 THE PADDOCK, EASTLEIGH, SO50 4SD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
28 Mar 2023
Validated
3 May 2023
Determination deadline
28 Jun 2023
Local authority
Eastleigh Borough Council

Application overview

Proposed single storey side extension and single storey link to garage. Alterations to fenestration. (Revision H/21/91468)

Proposal details

Reference
H/23/94958
Alternative references
12037362
Ward
Eastleigh North Ward
Parish
Allbrook and North Boyatt CP
Agent
Mr Kevin Goater

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 19 of 19

DocumentPublishedAction
H_23_94958 letter of comfortCorrespondence Outgoing · PDF13 Jul 2023View
H_23_94958 Delegated Officer ReportOfficer Report · PDF20 Jun 2023View
H_23_94958 PL_Final DecisionDecision Notice · PDF20 Jun 2023View
Southern Water LetterConsultation Response · PDF13 Jun 2023View
Ecology response amended for H 23 94958 8 THE PADDOCK, EASTLEIGHConsultee Response · PDF1 Jun 2023View
Southern Water LetterConsultation Response · PDF1 Jun 2023View
ParishConsultation Response · PDF24 May 2023View
Ecology response for H 23 94958 8 THE PADDOCK, EASTLEIGHConsultee Response · PDF23 May 2023View
Tree OfficerConsultation Response · PDF17 May 2023View
Location and Block PlansPlans · PDF3 May 2023View
Proposed Floor PlanFloor Plan · PDF28 Mar 2023View
Existing Floor PlansFloor Plan · PDF28 Mar 2023View
O S MapPlan · PDF28 Mar 2023View
Existing Elevation PlansElevations Plan · PDF28 Mar 2023View
Proposed Elevation PlansElevations Plan · PDF28 Mar 2023View
Application Form RedactedApplication Form · PDF28 Mar 2023View
Block and Location PlanLocation Plan · PDF28 Mar 2023View
Trees in relation to design, demolition and constructionSupporting Documents · PDF20 May 2022View
Tree Protectio PlanPlan · PDF20 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_94958 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: PL 01, PL 02, PL03, PL 04, PL 05, PL 06 and PL 07 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing buildings. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The annexe hereby permitted shall only be used in conjunction with the existing dwelling or by a dependent relative of the occupiers of the existing dwelling and shall not be sold off, occupied or used as an independent unit of accommodation. Reason: The property is not suitable for sub-division into two separate dwellings.
  5. The development must accord with the arboricultural report reference 2022-1432. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference 2022-1432. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website.
  7. Note to Applicant: - The 16 Inches public water trunk main and 4 inches distribution main requires a clearance of 3 metres on either side of the water mains to protect it from construction works and to allow for future access for maintenance. - No excavation, mounding or tree planting should be carried out within 3 metres of the external edge of the public water mains without consent from Southern Water. - The 225 mm public surface water sewer requires a clearance of 3 metres on either side of the gravity sewers to protect it from construction works and to allow for future access for maintenance. - No development or tree planting should be carried out within 3 metres of the external edge of the public sewer without consent from Southern Water. - No soakaway, swales, ponds, watercourses or any other surface water retaining or conveying features should be located within 5 metres of public and water mains.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.