Council planning record

First floor rear and front extensions with dormer, single storey rear extension, alteration to fenestration and works to TPO trees

AMOKURA HOUSE, BRIDGE ROAD, BURSLEDON, SOUTHAMPTON, SO31 8AL

Decided PermitReference: H/23/94945Eastleigh Borough Council

Last published check: 8 Oct 2026, 03:11. Check the council record for more recent changes.

Application location

AMOKURA HOUSE, BRIDGE ROAD, BURSLEDON, SOUTHAMPTON, SO31 8AL

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 Mar 2023
Validated
27 Mar 2023
Determination deadline
8 Sept 2023
Local authority
Eastleigh Borough Council

Application overview

First floor rear and front extensions with dormer, single storey rear extension, alteration to fenestration and works to TPO trees

Proposal details

Reference
H/23/94945
Alternative references
12048243
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
Coast Architecture Ltd (Mr Nicholas Jenkins)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
H_23_94945 PL_Final DecisionDecision Notice · PDF4 Sept 2023View
H_23_94945 Delegated Officer ReportOfficer Report · PDF30 Aug 2023View
Proposed Block, Floor and Elevation PlansPlans · PDF3 May 2023View
Southern Water GISConsultation Response · PDF24 Apr 2023View
Southern Water letterConsultation Response · PDF24 Apr 2023View
Application Form RedactedApplication Form · PDF27 Mar 2023View
Tree Survey ReportSupporting Documents · PDF27 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_94945 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 101 and LOC 01 and 001 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The external materials to be used in the construction of the extension hereby permitted shall match those of the host dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The first floor windows on the northwest roof-slope of the extension hereby permitted shall be either: a) obscure glazed and non opening below a height of 1.7 metres above the internal floor level of the areas they serve; or b) positioned at least 1.7 metres above the internal floor level of the areas they serve. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. No additional or altered windows shall be constructed in the northwest elevation of the development hereby approved. Reason: To protect the amenity and privacy of the adjoining residential properties.
  6. The development must accord with the arboricultural report reference JFA0316. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  7. The development hereby permitted shall be implemented in accordance with the recommendations outlined in the submitted Phase II Bat Surveys & Mitigation Strategy by ecosupport (2023) or the most recent accepted ecological report. This includes a bat brick and a swift brick, and night scented flowering plants attract moths as food for bats. A hedgehog habitat area and night scented flowering plants could also be included in the garden. Reason: To protect and enhance biodiversity.
  8. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  9. Note to Applicant: To avoid disturbance of nesting birds or damage to their nests, any works impacting the hedgerows or trees on site will be undertaken outside of the bird-nesting season (typically March – September, dependent on weather). If this is not possible, the buildings should be thoroughly checked by an ecologist immediately prior to demolition. If any active nests are found, they should be left undisturbed with a 5m buffer erected (barrier tape or similar) and monitored until the chicks have fledged and left the nest.
  10. Note to Applicant: Wildlife sensitive lighting, as described in the reports, should be used if any exterior lighting is required for safety reason.
  11. Note to Applicant: Please be aware that the property is already built over an existing public foul sewer. If the works to be carried out will alter the existing foundation line or depth of the sewer it will be necessary for the applicant to contact Southern Water.
  12. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  13. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.