Council planning record

Single storey side and rear extensions (Amended description and plans)

60 HUNT AVENUE, NETLEY ABBEY, SOUTHAMPTON, SO31 5BE

Decided PermitReference: H/23/94819Eastleigh Borough Council

Last published check: 8 Oct 2026, 07:49. Check the council record for more recent changes.

Application location

60 HUNT AVENUE, NETLEY ABBEY, SOUTHAMPTON, SO31 5BE

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
6 Mar 2023
Validated
6 Mar 2023
Determination deadline
24 May 2023
Local authority
Eastleigh Borough Council

Application overview

Single storey side and rear extensions (Amended description and plans)

Proposal details

Reference
H/23/94819
Alternative references
11986138
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
Mr Paul Blay

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
H_23_94819 PL_Final DecisionDecision Notice · PDF24 May 2023View
H_23_94819 Delegated Officer ReportOfficer Report · PDF23 May 2023View
Network Rail Consultation ResponseConsultation Response · PDF4 May 2023View
AMENDED Proposed RendersPlans · PDF25 Apr 2023View
AMENDED Site PlanSite Layout Plan · PDF25 Apr 2023View
AMENDED Proposed Floor, Section and Roof PlansPlans · PDF25 Apr 2023View
Ecology response amended 25 4 23 H 23 94819 60 HUNT AVENUE, NETLEY ABBEYConsultee Response · PDF25 Apr 2023View
AMENDED Proposed ElevationsElevations Plan · PDF25 Apr 2023View
Ecology response amended for H 23 94819 60 HUNT AVENUE, NETLEY ABBEYConsultee Response · PDF20 Apr 2023View
Ecology response for H 23 94819 60 HUNT AVENUE, NETLEY ABBEYConsultee Response · PDF6 Apr 2023View
Hound PC Consultation ResponseConsultation Response · PDF28 Mar 2023View
SUPERSEDED Site PlanSite Layout Plan · PDF6 Mar 2023View
Existing Floor PlansFloor Plan · PDF6 Mar 2023View
Location PlanLocation Plan · PDF6 Mar 2023View
Existing Renders PlanPlan · PDF6 Mar 2023View
SUPERSEDED Proposed Elevations PlansPlans · PDF6 Mar 2023View
Application Form RedactedApplication Form · PDF6 Mar 2023View
SUPERSEDED Proposed Floor. Section and Roof PlansPlans · PDF6 Mar 2023View
SUPERSEDED Proposed Renders PlanPlan · PDF6 Mar 2023View
Existing Elevations PlansElevations Plan · PDF6 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_94819 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 02353 Rev A, 02354 Rev A, 02355 Rev A, 02356 Rev B, 02357 Rev B, 02358 Rev B and 02359 Rev B Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: Vegetation clearance or clearance of any structure that could support nesting birds would need to be done outside of nesting season which is between March and August inclusive. If this is not possible then a pre-works check by a suitably qualified ecologist would be required. If any active nests are found all work must stop and the nest be protected by a 5 m buffer until after the chicks have fledged and left the nest.
  5. Note to Applicant: Biodiversity enhancements have been recommended. A bat brick/box and a swift brick/nest box may be appropriate to build into the extensions. Built in boxes do not require maintenance and cannot fall off. The Bat Conservation Trust recommends installing a bat brick/box at least 4m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  6. Note to Applicant: This planning permission does not convey the right for the development to encroach over, under or on land which is not within your ownership, without the consent of the landowner
  7. Note to Applicant: You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining occupier(s) where the building owner intends to carry out work which involves: 1. Work involving an existing shared wall with another property; 2. Building on the boundary with a neighbouring property; 3. Excavating near a neighbouring building, and that work falls within the scope of the Act. Procedures under this Act are separate from the need for planning permission and building regulations approval. ‘The Party Wall etc. Act 1996: explanatory booklet’ is available at www.communites.gov.uk
  8. Note to Applicant: The developer must ensure that their proposal, both during construction and after completion does not: • encroach onto Network Rail land • affect the safety, operation or integrity of the company’s railway and its infrastructure • undermine its support zone • damage the company’s infrastructure • place additional load on cuttings • adversely affect any railway land or structure • over-sail or encroach upon the air-space of any Network Rail land • cause to obstruct or interfere with any works or proposed works or Network Rail development both now and in the future Network Rail strongly recommends the developer complies with the following comments and requirements to maintain the safe operation of the railway and protect Network Rail’s infrastructure.
  9. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.