Council planning record

Raise ridge height of roof to create first floor accommodation, roof alteration to existing front addition, reconfiguration of floor plan at ground floor (including levelling works) (AMENDED DESCRIPTION)

48A BROWNHILL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2EE

Decided PermitReference: H/23/94807Eastleigh Borough Council

Last published check: 7 Oct 2026, 23:09. Check the council record for more recent changes.

Application location

48A BROWNHILL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2EE

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
2 Mar 2023
Validated
20 Apr 2023
Determination deadline
5 Oct 2023
Local authority
Eastleigh Borough Council

Application overview

Raise ridge height of roof to create first floor accommodation, roof alteration to existing front addition, reconfiguration of floor plan at ground floor (including levelling works) (AMENDED DESCRIPTION)

Proposal details

Reference
H/23/94807
Alternative references
11929798
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
Paul Cashin Architects (Mr Paul Cashin)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
H_23_94807 PL_Final DecisionDecision Notice · PDF26 Sept 2023View
H_23_94807 Delegated Officer ReportOfficer Report · PDF25 Sept 2023View
Ecology response amended for H 23 94807 48A BROWNHILL ROAD, CHANDLER'S FORDConsultee Response · PDF20 Sept 2023View
Site PlanSite Layout Plan · PDF31 May 2023View
Existing Plans and ElevationsElevations And Floor Plan · PDF31 May 2023View
Proposed Floor PlansFloor Plan · PDF31 May 2023View
Proposed ElevationsElevations Plan · PDF31 May 2023View
Southern Water GIS · PDF23 May 2023View
Southern Water LetterConsultation Response · PDF23 May 2023View
CS- Planning- 03.05.23 - H.23.94807 - 48A Brownhill Road, Chandler's Ford - Consultation ResponseConsultation Response · PDF3 May 2023View
Site Levels Flood Risk AnalysisSupporting Documents · PDF20 Apr 2023View
Photo ReportPhotographs · PDF2 Mar 2023View
Application Form RedactedApplication Form · PDF2 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_23_94807 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 2301-PCA-DR-A-200, 2301-PCA-DR-A-101, 2301-PCA-EXTG-A-001 and 2301-PCA-DR-A-400 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise be in accordance with those in the Application Form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The proposed side facing rooflights, shall be obscure glazed to Pilkingtons Level 3 or greater, with a top opening light, or no opening parts less than 1.7 metres above the floor level of the room. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. No excavation, demolition or development related works shall take place on site until an arboricultural method statement and a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), are submitted and approved by the LPA. The approved arboricultural documents must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to Applicant: All site personnel must be made aware of the strict protection afforded to bats and the need to stop work and seek further advice from a licensed bat specialist if a bat is discovered.
  8. Note to Applicant: If work has not started within 18 months of the report date, an update bat survey will be required.
  9. Note to Applicant: A built-in bat box or bat tube is required to replace bat roost opportunities lost to the development. A built-in swift nest box is also recommended as a biodiversity enhancement.
  10. Note to Applicant: The gap in the soffit where blue tits have been reported nesting should be blocked before the bird nesting season if works are likely to take place within this period. A nest box suitable for blue tits must be installed on the mature oak in the rear garden to replace the nest site in the house which was used by blue tits.
  11. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  12. Note to Applicant: Where Public Rights of Way are close to application sites or are used for access to the development site, applications must show these Rights of Way on the submitted plans and detail how they will be accommodated within the proposals. Government guidance requires that applications should not be validated unless such a plan has been submitted.
  13. Note to Applicant: Nothing connected with the development, or its future use, shall have an adverse effect on the Public Rights of Way, which must always remain available for safe public use at all times.
  14. Note to Applicant: Should the developer identify the need to temporarily close or adjust a PROW, they should follow the guidance on the Hampshire County Council website. This includes further information on the duties as a land owner and/or developer, found at Landowners guide to public rights of way | Hampshire County Council (hants.gov.uk)
  15. Note to Applicant: No vehicles (including builder’s and contractor’s), machinery, equipment, materials, spoil, scaffolding, or anything else associated with the works, use, or occupation of the development, shall be left on or near to a Public Right of Way as to cause obstruction, hindrance, or a hazard to the legitimate users. The public retain the right to use the public right of way at all times.
  16. Note to Applicant: The grant of planning permission does not entitle developers to obstruct a public right of way. The diversion or stopping up of footpaths, bridleways and restricted byways is a separate process which must be carried out before the paths are affected by the development. It cannot be assumed that because planning permission has been granted that an Order under section 257 will invariably be made or confirmed. Development, in so far as it affects a right of way, must not be started and the right of way should be kept open for public use, unless or until the necessary order has come into effect.
  17. Note to Applicant: All vehicles that would be legitimately accessing the site via a Public Right of Way should give way to public users, which could include horse-riders and cyclists, at all times. In cases with legitimate vehicular access a Construction Traffic (or Environmental) Management Plan (CTMP) should be submitted to, and approved by, Hampshire Countryside Service as Highway Authority prior to any approval by the Planning Authority, and prior to commencement, to ensure the protection of biodiversity and public safety.
  18. Note to Applicant: There must be no surface alterations to a Public Right of Way without the consent of Hampshire County Council as Highway Authority. Planning permission under the Town and County Planning Act (1990) does not provide this and separate consent is required. To carry out any such works without this permission would constitute an offence under Section 131 of the Highways Act (1980).
  19. Note to Applicant: No works to the surface of the Public Right of Way shall be carried out without prior approval of the Area Countryside Access Manager. Any damage caused to the surface of the Public Right of Way by construction traffic will be required to be restored to the satisfaction of the Area Countryside Access Manager on the completion of the build.
  20. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  21. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.