The development hereby permitted shall be implemented in accordance with the following plans numbered: P01,P02, P03, P04, P05 and P06 Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
Note to applicant: 1. Where Public Rights of Way are close to application sites or are used for access to the development site, applications must show these Rights of Way on the submitted plans and detail how they will be accommodated within the proposals. Government guidance requires that applications should not be validated unless such a plan has been submitted. 2. Nothing connected with the development, or its future use, shall have an adverse effect on the Public Rights of Way, which must always remain available for safe public use at all times. No vehicles (including builder’s and contractor’s), machinery, equipment, materials, spoil, scaffolding, or anything else associated with the works, use or occupation of the development, shall be left on or near to all Public Rights of Way as to cause obstruction, hindrance or a hazard to the legitimate users. The public retain the right to use PROWs at all times. 3. Should the developer identify the need to temporarily close or adjust a PROW, they should follow the guidance on the Hampshire County Council website. This includes further information on the duties as a landowner and/or developer, found at Landowners guide to public rights of way | Hampshire County Council (hants.gov.uk). 4. Granting of planning permission does not grant the applicant access rights to the site via the PROW network and separate consent is required. 5. There must be no surface alterations to a Public Right of Way without the consent of Hampshire County Council as Highway Authority. Planning permission under the Town and County Planning Act (1990) does not provide this and separate consent is required. To carry out any such works without this permission would constitute an offence under Section 131 of the Highways Act (1980). 6. No works to the surface of the Public Right of Way shall be carried out without prior approval of the Area Countryside Access Manager. Any damage caused to the surface of the Public Right of Way by construction traffic will be required to be restored to the satisfaction of the Area Countryside Access Manager upon the completion of the build.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.