Garage conversion, ground floor rear/side extension, first floor rear extension with side dormer and juliet balcony at rear and alteration to fenestration
Garage conversion, ground floor rear/side extension, first floor rear extension with side dormer and juliet balcony at rear and alteration to fenestration
Proposal details
Reference
H/23/94778
Alternative references
11971354
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
David Windsor (Mr David Windsor)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans numbered: W.R.01, W.R.02. Rev B, WM03 and LOC 01 Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The proposed side dormer window which is to service an en-suite, shall be obscure glazed to Pilkingtons level 3 or equivalent and be top opening only, unless the window is positioned at least 1.7 metres above the floor of the room in which it is installed. Once installed the window shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
The garage conversion hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the existing dwelling and shall not be used for business, commercial or industrial purposes or as an independent residential unit. Reason: The site is not considered suitable for subdivision or to be in a non-residential use
Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
Note to Applicant: It is recommended to install a bat brick/box and a swift brick/nest box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.