Council planning record

Single storey front side and rear extension

1 LINNET SQUARE, EASTLEIGH, SO50 9JL

Decided PermitReference: H/23/94685Eastleigh Borough Council

Last published check: 8 Oct 2026, 10:38. Check the council record for more recent changes.

Application location

1 LINNET SQUARE, EASTLEIGH, SO50 9JL

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
8 Feb 2023
Validated
15 Feb 2023
Determination deadline
12 Apr 2023
Local authority
Eastleigh Borough Council

Application overview

Single storey front side and rear extension

Proposal details

Reference
H/23/94685
Alternative references
11922375
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
Decision NoticeDecision Notice · PDF12 Apr 2023View
Delegated Officer ReportOfficer Report · PDF6 Apr 2023View
Southern Water letterConsultation Response · PDF17 Mar 2023View
Southern Water GISConsultation Response · PDF17 Mar 2023View
Location Plan, Site Plan, Existing and Proposed Elevations and Floor PlansPlans · PDF15 Feb 2023View
Application Form RedactedApplication Form · PDF8 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01_ Rev C Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  5. Note to Applicant: Southern Water requires a formal application for any new connection to the public sewer to be made by the applicant or developer. To make an application visit Southern Water's Get Connected service: developerservices.southernwater.co.uk and please read the New Connections Charging Arrangements documents which are available on the website via the following link: southernwater.co.uk/developing-building/connection-charging-arrangements
  6. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.