Council planning record

Demolition of the garage. Two storey side extensions. Two storey rear extensions. Alteration to fenestration.

9 OATLANDS CLOSE, BOTLEY, SOUTHAMPTON, SO32 2DF

Decided PermitReference: H/23/94609Eastleigh Borough Council

Last published check: 8 Oct 2026, 12:02. Check the council record for more recent changes.

Application location

9 OATLANDS CLOSE, BOTLEY, SOUTHAMPTON, SO32 2DF

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 Jan 2023
Validated
2 Feb 2023
Determination deadline
19 May 2023
Local authority
Eastleigh Borough Council

Application overview

Demolition of the garage. Two storey side extensions. Two storey rear extensions. Alteration to fenestration.

Proposal details

Reference
H/23/94609
Alternative references
11886893
Ward
Botley Ward
Parish
Botley CP
Agent
Whole Concepts (Mr Stephen Hole)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
Southern Water LetterConsultation Response · PDF23 May 2023View
GIS · PDF23 May 2023View
Decision NoticeDecision Notice · PDF19 May 2023View
Officer ReportOfficer Report · PDF19 May 2023View
Ecology response amended for H 23 94609 9 OATLANDS CLOSE, BOTLEY, SOUTHAMPTONConsultee Response · PDF3 May 2023View
Parish commentConsultation Response17 Feb 2023View
Location PlanLocation Plan · PDF27 Jan 2023View
Block PlanBlock Plan · PDF27 Jan 2023View
Existing Elevations and Floor PlansPlans · PDF27 Jan 2023View
Application Form Redacted · PDF27 Jan 2023View
Proposed Elevations and Floor PlansPlans · PDF27 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1 Rev 1, 4 Rev 1, 2 Rev 1 and 3 Rev 1 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: Workers must remain vigilant of the potential presence of bats, not obstruct their roosts or do anything that could cause harm to a bat. Any tiles that need to be moved must be removed carefully, by hand. If bats or any signs of bats are found during construction, all work must stop immediately, and Natural England must be called. The Bat Conservation Trust website ( https://www.bats.org.uk/ ) explains why bats are protected and what to do if you find a bat at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ivefound-a-bat-during-works.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.