Council planning record

Two storey side extension

1 TOTNES CLOSE, EASTLEIGH, SO50 4QW

Decided PermitReference: H/23/94450Eastleigh Borough Council

Last published check: 8 Oct 2026, 18:36. Check the council record for more recent changes.

Application location

1 TOTNES CLOSE, EASTLEIGH, SO50 4QW

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
4 Jan 2023
Validated
4 Jan 2023
Determination deadline
15 Mar 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey side extension

Proposal details

Reference
H/23/94450
Alternative references
11815900
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
R & G Design (George Gamblin)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
Decision NoticeDecision Notice · PDF13 Mar 2023View
Officer ReportOfficer Report · PDF9 Mar 2023View
Application Form RedactedApplication Form · PDF4 Jan 2023View
Proposed Floor and Elevations PlansPlans · PDF4 Jan 2023View
Existing Floor and Elevations PlansPlans · PDF4 Jan 2023View
Location PlanLocation Plan · PDF4 Jan 2023View
Site PlanBlock Plan · PDF4 Jan 2023View
PhotoPhotographs4 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: BLOC 01, LOC01, Dawkins 370.2 and Dawkins 370.1 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Any excavations or open pipes will need to be covered at night or provided with a small mammal escape ramp to allow animals such as hedgehogs to escape if they fall in. If hedgehogs are found on site, they should not be handled but must be allowed to move away to safety on their own. If any hedgehogs appear to be in distress, a hedgehog rescue worker should be contacted. Information is available on the website of the British Hedgehog Preservation society at https://www.britishhedgehogs.org.uk/found-a-hedgehog/. No fires will be allowed on site and building materials must be stored on hard standing to prevent hedgehogs from sheltering beneath them. Reason: To protect animals during construction.
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.