Single storey rear extension and associated internal alterations. Removal of slate-hung cladding. Replacement of front porch. Alterations to fenestration.
148 CHURCH ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6DS
Decided PermitReference: H/22/94423Eastleigh Borough Council
Last published check: 8 Oct 2026, 19:53. Check the council record for more recent changes.
Application location
148 CHURCH ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6DS
This record has no verified map location.
Application summary
Status
Decided Permit
Application type
Householder planning
Received
21 Dec 2022
Validated
21 Dec 2022
Determination deadline
15 Feb 2023
Local authority
Eastleigh Borough Council
Application overview
Single storey rear extension and associated internal alterations. Removal of slate-hung cladding. Replacement of front porch. Alterations to fenestration.
Proposal details
Reference
H/22/94423
Alternative references
11784260
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
Hall & Ensom Ltd (Mr David Ensom)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans numbered: 22.27.00 and 22.27.01/A Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used must match as closely as possible, in type, colour and texture those described on the approved plan 22.27.01/A. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
Prior to commencement of works, a European Protected Species Licence is required from Natural England. Removal of hanging tiles and any other ecologically sensitive features shall only be done under the supervision of a bat licensed ecologist. Reason: To ensure protection of bats
Any demolition and construction works must follow the precautionary working method statement for herptiles, as detailed in Appendix 2 of Weymouth House Bat Survey Report and Mitigation Strategy Report, referenced V1.2 January 2023. Construction materials must not be stored in potential reptile habitat areas. In the event that any reptiles are found during construction, work must stop and a suitably qualified ecologist shall be contacted for advice. Reason: To ensure the protection of reptiles
In the event that any bird nests are discovered, a suitably qualified ecologist shall be contacted for advice. Destruction of any areas with nesting bird potential must be done either outside of nesting bird season (March-August inclusive) or after a pre-works check by a suitably qualified ecologist. Reason: To protect breeding birds
The biodiversity enhancements as recommended in Section 5 of the Weymouth House Bat Survey Report and Mitigation Strategy Report, referenced V1.2 January 2023, shall be implemented in full, in accordance with the details of the report. Reason: To ensure biodiversity enhancement
The brickwork to be uncovered on the main dwelling shall be be altered, and repaired where necessary, using bricks to match existing in size, texture, colour and mix with lime mortar to match original in mix, colour and texture. Reason: To ensure the listed building is suitably preserved
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.