Council planning record

Two storey side extension, single storey rear extension and alteration to fenestration

1 NEWBURY CLOSE, FAIR OAK, EASTLEIGH, SO50 8ES

Decided PermitReference: H/22/94334Eastleigh Borough Council

Last published check: 8 Oct 2026, 21:22. Check the council record for more recent changes.

Application location

1 NEWBURY CLOSE, FAIR OAK, EASTLEIGH, SO50 8ES

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
6 Dec 2022
Validated
13 Dec 2022
Determination deadline
21 Apr 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey side extension, single storey rear extension and alteration to fenestration

Proposal details

Reference
H/22/94334
Alternative references
11745693
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
R & G Design (George Gamblin)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
H_22_94334 PL_Final Decision.docxDecision Notice19 Apr 2023View
H_22_94334 Delegated Officer ReportOfficer Report · PDF18 Apr 2023View
Ecology response amended H 22 94334 1 NEWBURY CLOSE, FAIR OAK · PDF31 Mar 2023View
PRA- 1 Newbury Close, Fair Oak, Hampshire, SO50 8ES · PDF29 Mar 2023View
Ecology response amended H 22 94334 1 NEWBURY CLOSE, FAIR OAKConsultee Response · PDF7 Feb 2023View
AMENDED Existing and Proposed Elevations and Floor PlansPlans · PDF6 Feb 2023View
Parking PlanPlan · PDF6 Feb 2023View
Fair Oak Parish Council Consultation ResponseConsultation Response · PDF11 Jan 2023View
Ecology response for H 22 94334 1 NEWBURY CLOSE, FAIR OAKConsultee Response · PDF4 Jan 2023View
SUPERSEDED Existing and Proposed Elevations and Floor PlansElevations And Floor Plan · PDF13 Dec 2022View
Application Form RedactedApplication Form · PDF6 Dec 2022View
Block PlanBlock Plan · PDF6 Dec 2022View
Location PlanLocation Plan · PDF6 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94334 PL_Final Decision.docx
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 365.2, BLOC 01, LOC 01 and Lucas 365.Parking Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The development hereby permitted shall not be brought into use until a minimum of 3 car parking spaces have been provided within the curtilage of the site and thereafter maintained and kept available. Reason: To ensure the adequate provision of on site parking for the purpose of highway safety.
  5. The development hereby permitted shall be implemented in accordance with the recommendation outlined in the Preliminary Bat Roost Assessment by Arbtech (March 2023). It is recommended at least one bat box be installed on the new extension. Reason: To protect and enhance biodiversity
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to Applicant: The applicant is advised that the hanging tiles that are showing the first signs of slipping should be secured back into place before these develop into potential bat roosting features if they were to slip further or fall.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.