Council planning record

First floor front and rear extension at the rear, ground floor storey front, side and rear extension

18 RANDALL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5AL

Decided PermitReference: H/22/94316Eastleigh Borough Council

Last published check: 8 Oct 2026, 22:02. Check the council record for more recent changes.

Application location

18 RANDALL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5AL

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
1 Dec 2022
Validated
9 Dec 2022
Determination deadline
17 Feb 2023
Local authority
Eastleigh Borough Council

Application overview

First floor front and rear extension at the rear, ground floor storey front, side and rear extension

Proposal details

Reference
H/22/94316
Alternative references
11736323
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
H_22_94316 PL_Final DecisionDecision Notice · PDF10 Feb 2023View
H_22_94316 Delegated Officer ReportOfficer Report · PDF8 Feb 2023View
Location Plan and Site PlanPlans · PDF30 Jan 2023View
Proposed Elevation PlansElevations Plan · PDF30 Jan 2023View
Proposed Roof PlanRoof Plan · PDF30 Jan 2023View
Proposed Floor PlansFloor Plan · PDF30 Jan 2023View
Certificate B RedactedSupporting Documents · PDF9 Dec 2022View
Application Form RedactedApplication Form · PDF1 Dec 2022View
Existing ElevationsElevations Plan · PDF1 Dec 2022View
Existing Floor PlansFloor Plan · PDF1 Dec 2022View
Existing Roof PlanRoof Plan · PDF1 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94316 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 803/11/100 Rev A, 803/11/104 Rev A, 803/11/106 Rev A, 803/11/105 Rev A, 803/11/102, 803/11/103 and 803/11/101 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed in the application form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The proposed side facing windows at first floor level, shall be obscure glazed to Pilkingtons level 3 or equivalent and be top opening only, unless the windows are positioned at least 1.7 metres above the floor of the room in which they are installed. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  6. Note to Applicant: If evidence of an active bird’s nest is found during construction, a 5 m buffer must be erected around the nest to protect it from disturbance until after the chicks have fledged and left the nest.
  7. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works
  8. Note to Applicant: A hedgehog house at the far end of the garden would be a good biodiversity enhancement, in addition to a bat brick (on the eastern elevation) and a swift brick (western elevation preferred- because there is a bigger drop available) built into the side gable ends of the extension.
  9. Note to Applicant: If any vegetation will need to be removed it must be done either outside of bird nesting season (which is March thorough August inclusive) or if this is not possible, then immediately after a check by a suitably qualified ecologist.
  10. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.