Council planning record

Ground floor rear/side extension and two storey side extension

1 CHALVINGTON ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 3DY

Decided PermitReference: H/22/94302Eastleigh Borough Council

Last published check: 8 Oct 2026, 22:33. Check the council record for more recent changes.

Application location

1 CHALVINGTON ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 3DY

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
30 Nov 2022
Validated
7 Dec 2022
Determination deadline
10 Feb 2023
Local authority
Eastleigh Borough Council

Application overview

Ground floor rear/side extension and two storey side extension

Proposal details

Reference
H/22/94302
Alternative references
11732258
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
Officer ReportOfficer Report · PDF9 Feb 2023View
Decision NoticeDecision Notice · PDF9 Feb 2023View
Ecology response amended H 22 94302 1 CHALVINGTON ROAD, CHANDLER'S FORDConsultee Response · PDF6 Feb 2023View
AMENDED Proposed and Existing Elevations, Floor, Site Layout and Location PlanElevations And Floor Plan · PDF31 Jan 2023View
Tree Officer commentsConsultation Response3 Jan 2023View
SUPERSEDED Location Plan, Site Plan, Existing and Proposed Elevations and Floor PlansPlans · PDF15 Dec 2022View
Location Plan, Site Plan, Existing and Proposed Elevations and Floor PlansPlans · PDF7 Dec 2022View
Application Form RedactedApplication Form · PDF30 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01_ Rev C Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  5. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.