Council planning record

Single storey side extension

30 THISTLE ROAD, HEDGE END, SOUTHAMPTON, SO30 0TT

Decided PermitReference: H/22/94210Eastleigh Borough Council

Last published check: 9 Oct 2026, 02:28. Check the council record for more recent changes.

Application location

30 THISTLE ROAD, HEDGE END, SOUTHAMPTON, SO30 0TT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
16 Nov 2022
Validated
24 Nov 2022
Determination deadline
20 Nov 2024
Local authority
Eastleigh Borough Council

Application overview

Single storey side extension

Proposal details

Reference
H/22/94210
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Both Creative Partnership (Keith Cresdee)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
H_22_94210 PL_Final DecisionDecision Notice · PDF20 Nov 2024View
H_22_94210 Delegated Officer ReportOfficer Report · PDF20 Nov 2024View
Ecology response 6 11 2024 for H 22 94210 30 THISTLE ROAD, HEDGE ENDConsultee Response · PDF6 Nov 2024View
PEA PRA Bat Survey Report 05112024_RedactedEcological Assessment · PDF6 Nov 2024View
Ecology response H 22 94210 30 THISTLE ROAD, HEDGE ENDConsultation Response · PDF21 Dec 2022View
Southern Water Consultation ResponseConsultation Response · PDF19 Dec 2022View
Southern Water GIS MapConsultation Response · PDF19 Dec 2022View
Hedge End Town Council Consultation ResponseConsultation Response · PDF8 Dec 2022View
Application Form RedactedApplication Form · PDF22 Nov 2022View
Existing and Proposed Elevations and Floor PlansElevations And Floor Plan · PDF22 Nov 2022View
Bat SurveySupporting Documents · PDF16 Nov 2022View
Location PlanLocation Plan · PDF16 Nov 2022View
Block PlanBlock Plan · PDF16 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94210 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Existing and Proposed Elevations and Floor Plans - 21112022 1A3Block PlanLocation Plan Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in The Materials Section of the application form and the approved drawings. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The development hereby permitted shall be implemented in full with the recommended ecological enhancements outlined in the Preliminary Ecological Appraisal by CC Ecology (November 2024). This will include the installation of bird boxes on the approved extension and the planting of native plants to create a wildlife garden. Reason: To protect wildlife species and provide biodiversity enhancements to the site.
  5. The development hereby permitted shall follow a precautionary working method which shall include: Any excavations must be covered at night of fitted with a small mammal escape ramp.No fires can be lit on site.Any piles of materials must be kept on hard standing or on pallets. If any hedgehogs or dormice are found on site they must not be handled but be allowed to move away to a place of safety on their own. Reason: To protect wildlife species
  6. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  7. Note to Applicant: If building work or vegetation clearance is taking place within the breeding bird season (March through August inclusive), the buildings and vegetation (including the scrub vegetation outside the southwestern boundary of the site immediately adjacent to the construction zone) must be checked by a suitably qualified ecologist for the presence of nesting birds just prior to the start of works. Any active bird’s nest found prior to or during the construction period must remain undisturbed, with a suitable 5 m buffer, until after the young have fledged and left the nest.
  8. Note to Applicant: The applicant is advised to contact Building Control with regards to the adequacy of the soakaways to dispose of surface water from the proposed development.
  9. Note to Applicant: Southern Water requires a formal application for any new connection to the public sewer to be made by the applicant or developer. To make an application visit Southern Water’s Get Connected service: Home (southernwater.co.uk). Please refer to Southern Water’s consultation response for further advice.
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.