Council planning record

Single storey rear/side extension and alteration to fenestration

32 HOBB LANE, HEDGE END, SOUTHAMPTON, SO30 0GJ

Decided PermitReference: H/22/94179Eastleigh Borough Council

Last published check: 9 Oct 2026, 06:59. Check the council record for more recent changes.

Application location

32 HOBB LANE, HEDGE END, SOUTHAMPTON, SO30 0GJ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
14 Nov 2022
Validated
14 Nov 2022
Determination deadline
9 Jan 2023
Local authority
Eastleigh Borough Council

Application overview

Single storey rear/side extension and alteration to fenestration

Proposal details

Reference
H/22/94179
Alternative references
11677092
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
Officer ReportOfficer Photos · PDF9 Jan 2023View
Decision NoticeDecision Notice · PDF9 Jan 2023View
Parish commentConsultation Response8 Dec 2022View
Application Form RedactedApplication Form · PDF14 Nov 2022View
Location Plan, Site Plan, Existing and Proposed Elevations and Floor PlansPlans · PDF14 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01_ Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing buildings. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.