Council planning record

Single storey extension, connecting the main house to the entertainment wing with the addition of a balcony with support posts to the rear elevation. Alterations to fenestrations

ASHBERRY HOUSE, WINCHESTER ROAD, BOTLEY, SOUTHAMPTON, SO32 2BX

Decided PermitReference: H/22/94138Eastleigh Borough Council

Last published check: 9 Oct 2026, 06:52. Check the council record for more recent changes.

Application location

ASHBERRY HOUSE, WINCHESTER ROAD, BOTLEY, SOUTHAMPTON, SO32 2BX

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
7 Nov 2022
Validated
14 Nov 2022
Determination deadline
9 Jan 2023
Local authority
Eastleigh Borough Council

Application overview

Single storey extension, connecting the main house to the entertainment wing with the addition of a balcony with support posts to the rear elevation. Alterations to fenestrations

Proposal details

Reference
H/22/94138
Alternative references
11675830
Ward
Botley Ward
Parish
Botley CP
Agent
Knight Architectural Design (Mr Ian Knight)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
H_22_94138 PL_Final DecisionDecision Notice · PDF5 Jan 2023View
H_22_94138 Delegated Officer ReportOfficer Report · PDF4 Jan 2023View
Proposed Parking PlanPlan · PDF14 Nov 2022View
Proposed Elevations PlanElevations Plan · PDF10 Nov 2022View
Existing First Floor PlanFloor Plan · PDF10 Nov 2022View
Existing Roof PlanRoof Plan · PDF10 Nov 2022View
Existing Ground Floor PlanFloor Plan · PDF10 Nov 2022View
Existing Elevations PlanElevations Plan · PDF10 Nov 2022View
Proposed First Floor PlanFloor Plan · PDF10 Nov 2022View
Proposed Roof PlanFloor Plan · PDF10 Nov 2022View
Proposed Ground Floor PlansFloor Plan · PDF10 Nov 2022View
Design and Access StatementDesign And Access Statement · PDF7 Nov 2022View
Application Form RedactedApplication Form · PDF7 Nov 2022View
Proposed Block PlanBlock Plan · PDF7 Nov 2022View
Location PlanLocation Plan · PDF7 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94138 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: KAD 08 A PP, KAD 07 A PP, KAD 01 A EX, KAD 03 A EX, KAD 06 A PP, KAD 04 A EX, KAD 02 A EX, KAD 05 A PP, KAD 11 A BLOCK and KAD 10 A SITE Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works
  5. Note to Applicant: Biodiversity enhancements will be required. It is recommended to install a bat box and swift nest box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift bricks/ nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm )
  6. Note to Applicant: Flowering plants to attract pollinators would also be a good biodiversity enhancement in the rear garden.
  7. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.