Council planning record

Two storey front/side extension and single storey rear extension

1 HUNT AVENUE, NETLEY ABBEY, SOUTHAMPTON, SO31 5BD

Decided PermitReference: H/22/94067Eastleigh Borough Council

Last published check: 9 Oct 2026, 04:15. Check the council record for more recent changes.

Application location

1 HUNT AVENUE, NETLEY ABBEY, SOUTHAMPTON, SO31 5BD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
26 Oct 2022
Validated
21 Nov 2022
Determination deadline
16 Jan 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey front/side extension and single storey rear extension

Proposal details

Reference
H/22/94067
Alternative references
11648680
Ward
Hamble & Netley Ward
Parish
Hound CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
H_22_94067 PL_Final DecisionDecision Notice · PDF13 Jan 2023View
H_22_94067 Delegated Officer ReportOfficer Report · PDF13 Jan 2023View
Southern Water Consultation ResponseConsultation Response · PDF13 Dec 2022View
Hound Parish Council Consultation ResponseConsultation Response · PDF13 Dec 2022View
Southern Water GIS MapConsultation Response · PDF13 Dec 2022View
Ecology response H 22 94067 1 HUNT AVENUE, NETLEY ABBEYConsultee Response · PDF5 Dec 2022View
Existing/Proposed Elevations, Floor and Roof PlansPlans · PDF9 Nov 2022View
Block PlanBlock Plan · PDF9 Nov 2022View
Location PlanLocation Plan · PDF9 Nov 2022View
Block PlanBlock Plan · PDF26 Oct 2022View
Application Form RedactedApplication Form · PDF26 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94067 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 001, BLOC01 and LOC01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture with those listed in the Materials Section of the application form and approved plan 001. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The first floor window serving the hallway on the south-western elevation [as marked on the approved plan 001] shall either be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight. Once installed the window[s] shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. The integral single garage hereby permitted shall only be used in conjunction with the existing dwelling and shall not, at any time, be used for business, commercial or industrial purposes or as an independent residential unit. Reason: To protect the amenity of the adjoining residential properties.
  6. The development hereby permitted shall not be brought into use until a minimum of three car parking spaces have been provided within the curtilage of the site and thereafter maintained and kept available. Reason: To ensure the adequate provision of on site parking for the purpose of highway safety.
  7. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works.
  8. Note to Applicant: Biodiversity enhancement is required. A bat brick/box and a swift brick/nest box may be appropriate to build into the extensions. Built in boxes do not require maintenance and cannot fall off. The Bat Conservation Trust recommends installing a bat brick/box at least 4m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  9. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.