Council planning record

Two storey side/rear extension. Single storey front extension. Alterations to fenestrations

117 HIGH STREET, WEST END, SOUTHAMPTON, SO30 3DY

Decided PermitReference: H/22/94056Eastleigh Borough Council

Last published check: 9 Oct 2026, 09:55. Check the council record for more recent changes.

Application location

117 HIGH STREET, WEST END, SOUTHAMPTON, SO30 3DY

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
24 Oct 2022
Validated
3 Nov 2022
Determination deadline
13 Jan 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey side/rear extension. Single storey front extension. Alterations to fenestrations

Proposal details

Reference
H/22/94056
Alternative references
11643326 & 12373743
Ward
West End North Ward
Parish
West End CP
Agent
Mrs Monika Litkowska

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
H_22_94056 NMA Decision NoticeNonmaterial Minor Amendment · PDF25 Sept 2023View
NMA Proposed Floor & Elevation PlansNonmaterial Minor Amendment · PDF7 Sept 2023View
Application Form RedactedNonmaterial Minor Amendment · PDF8 Aug 2023View
H_22_94056 Delegated Officer ReportOfficer Report · PDF10 Jan 2023View
H_22_94056 PL_Final DecisionDecision Notice · PDF10 Jan 2023View
Preliminary Roost AssessmentEcological Assessment · PDF23 Dec 2022View
Parish Council ResponseConsultation Response · PDF9 Dec 2022View
Ecology response amended H 22 94056 117 HIGH STREET, WEST ENDConsultation Response · PDF30 Nov 2022View
Southern Water Consultation ResponseConsultation Response · PDF28 Nov 2022View
Southern Water GIS MapConsultation Response · PDF28 Nov 2022View
Existing Floor, Elevations and Roof PlansPlans · PDF3 Nov 2022View
Proposed Elevations and Floor PlansElevations And Floor Plan · PDF24 Oct 2022View
Block PlanBlock Plan · PDF24 Oct 2022View
Application Form RedactedApplication Form · PDF24 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94056 NMA Decision Notice H_22_94056 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 Rev A, 02, 03 and Loc 01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in Materials Section of the application form and approved plan 02. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The Mitigations and Enhancements set out within Section 4 of 117 High Street, West End, Southampton, SO30 3DY, – Preliminary Roost Assessment – (December 2022) (by Arbtech) shall be implemented in full prior to the development being brought into use and thereafter maintained in perpetuity. Reason: To safeguard protected species and to enhance biodiversity.
  5. Note to Applicant: A precautionary working method for hedgehogs must be followed: If hedgehogs are using the site they would be sheltering under dense vegetation or within long grass, dead leaves, or piles of dead wood. These areas should be cleared by hand, not using a digger, to allow animals time to escape. Removal of potential habitat must not take place from November through March when animals may be hibernating. No fires can be lit on site. During construction any excavations or open pipes must be covered at night or fitted with a small mammal escape ramp (a rough board slanted at a shallow angle) to prevent hedgehogs from becoming trapped. If hedgehogs are found they should not be handled but be left to move away on their own to a place of shelter. If a hedgehog is found during development and/or there are welfare concerns, the British Hedgehog Preservation Society can be contacted for advice and guidance on 01584 890 801.
  6. Note to Applicant: There is a record of bats near this property. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  7. Note to Applicant: Biodiversity enhancement is required. A bat brick/box and a swift brick/nest box may be appropriate to build into the extensions. Built in boxes do not require maintenance and cannot fall off. The Bat Conservation Trust recommends installing a bat brick/box at least 4m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  8. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works. An investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  9. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.