Council planning record

Single storey side/rear extension. First floor internal alterations Alterations to fenestrations. Replace existing garage with carport and integral store

19 TWYFORD ROAD, EASTLEIGH, SO50 4HD

Decided PermitReference: H/22/94037Eastleigh Borough Council

Last published check: 9 Oct 2026, 13:20. Check the council record for more recent changes.

Application location

19 TWYFORD ROAD, EASTLEIGH, SO50 4HD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
20 Oct 2022
Validated
20 Oct 2022
Determination deadline
15 Dec 2022
Local authority
Eastleigh Borough Council

Application overview

Single storey side/rear extension. First floor internal alterations Alterations to fenestrations. Replace existing garage with carport and integral store

Proposal details

Reference
H/22/94037
Alternative references
11636178
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
Mr Craig Roppolo

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
H_22_94037 PL_Final DecisionDecision Notice · PDF12 Dec 2022View
H_22_94037 Delegated Officer ReportOfficer Report · PDF8 Dec 2022View
Southern Water GISConsultation Response · PDF21 Nov 2022View
Southern Water letterConsultation Response · PDF21 Nov 2022View
Ecology responseConsultee Response · PDF16 Nov 2022View
Proposed Floor PlanFloor Plan · PDF1 Nov 2022View
Proposed Elevation PlanElevations Plan · PDF1 Nov 2022View
Existing Elevations PlanElevations Plan · PDF20 Oct 2022View
Location PlanLocation Plan · PDF20 Oct 2022View
Existing Floor PlansFloor Plan · PDF20 Oct 2022View
Existing Elevations and Floor PlansElevations And Floor Plan · PDF20 Oct 2022View
Application Form RedactedApplication Form · PDF20 Oct 2022View
Block PlanBlock Plan · PDF20 Oct 2022View
Proposed Elevations and Floor PlanElevations And Floor Plan · PDF20 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94037 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 04 -11/22, 03 - 11/22, 06-11/22, LOC 01, 05-11/22, 02-11/22 and 01-11/22. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed in the application form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-withbats/ive-found-a-bat-during-works.
  5. Note to Applicant: Biodiversity enhancements are required. It is recommended to install a swift nest box. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or northwest out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
  6. Note to Applicant: Southern Water requires a formal application for any new connection to the public foul sewer to be made by the applicant or developer. Our initial investigations indicate that there are no public surface water sewers in the area to serve this development. Alternative means of draining surface water from this development are required. This should not involve disposal to a public foul sewer and should be in line with the Hierarchy of H3 of Building Regulations with preference for use of soakaways. gov.uk/government/publications/drainage-and-waste-disposal-approved-document-h
  7. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (February 2019), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.