Council planning record

Two storey and first floor rear extensions with elevational alterations

35 ST JOHNS ROAD, HEDGE END, SOUTHAMPTON, SO30 4DQ

Decided PermitReference: H/22/94035Eastleigh Borough Council

Last published check: 9 Oct 2026, 12:31. Check the council record for more recent changes.

Application location

35 ST JOHNS ROAD, HEDGE END, SOUTHAMPTON, SO30 4DQ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
20 Oct 2022
Validated
25 Oct 2022
Determination deadline
20 Dec 2022
Local authority
Eastleigh Borough Council

Application overview

Two storey and first floor rear extensions with elevational alterations

Proposal details

Reference
H/22/94035
Alternative references
11632077
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
H_22_94035 PL_Final DecisionDecision Notice · PDF12 Dec 2022View
H_22_94035 Delegated Officer ReportOfficer Report · PDF8 Dec 2022View
Southern Water Consultation ResponseConsultation Response · PDF29 Nov 2022View
Southern Water GIS MapConsultation Response · PDF29 Nov 2022View
Ecology response amended H 22 94035 35 ST JOHNS ROAD, HEDGE END (1)Consultation Response · PDF23 Nov 2022View
Hedge End Town Council ResponseConsultation Response · PDF17 Nov 2022View
Existing and Proposed Elevations, Floor, Block and Location PlansPlans · PDF20 Oct 2022View
Application Form RedactedApplication Form · PDF20 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_94035 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 Rev C Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is recommended that the removal of the single storey roof tiles be done outside the active bat season, (i.e. not between April and September), the tiles should be removed carefully by hand (lifting vertically) and that all workers be alert to signs of bats as explained on the Bat Conservation Trust website (https://www.bats.org.uk/advice/do-i-have-bats). If a bat is found, the tile must be replaced gently, work must stop immediately, and Natural England informed, with the contact information available on the website below. If the roof work must be done during the active bat season, it should be supervised by a bat-licensed ecologist to avoid any possibility of disturbing bats which might be roosting under the tiles.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: A precautionary working method will be required to protect hedgehogs. During construction any excavations or open pipes must be covered at night or fitted with a small mammal escape ramp (a rough board slanted at a shallow angle) to prevent hedgehogs from becoming trapped. If hedgehogs are found they should not be handled, but be left to move away on their own to a place of shelter. If a hedgehog is found during development and/or there are welfare concerns, the British Hedgehog Preservation Society can be contacted for advice and guidance on 01584 890 801. Further information is available at: https://www.britishhedgehogs.org.uk/wp-content/uploads/2019/05/developers-1.pdf
  7. Note to Applicant: Biodiversity enhancements are required. This property may be suitable for a bat box and/or a swift nest box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  8. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  9. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.