Council planning record

Proposed front porch, elevational alterations side dormers and part loft conversion (Part PD)

2 MOORGREEN ROAD, WEST END, SOUTHAMPTON, SO30 3EG

Decided PermitReference: H/22/94027Eastleigh Borough Council

Last published check: 9 Oct 2026, 13:33. Check the council record for more recent changes.

Application location

2 MOORGREEN ROAD, WEST END, SOUTHAMPTON, SO30 3EG

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
20 Oct 2022
Validated
20 Oct 2022
Determination deadline
15 Dec 2022
Local authority
Eastleigh Borough Council

Application overview

Proposed front porch, elevational alterations side dormers and part loft conversion (Part PD)

Proposal details

Reference
H/22/94027
Alternative references
11631747
Ward
West End North Ward
Parish
West End CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
Decision NoticeDecision Notice · PDF12 Dec 2022View
Officer ReportOfficer Report · PDF9 Dec 2022View
Parish CommentsConsultation Response · PDF9 Dec 2022View
Ecology ResponseConsultee Response · PDF16 Nov 2022View
Existing/Proposed Elevations, Floor, Location and Site PlansPlans · PDF20 Oct 2022View
Application Form RedactedApplication Form · PDF20 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 D Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-withbats/ive-found-a-bat-during-works. Biodiversity enhancements are required. Depending on the available elevations a bat box or a swift nest box might be appropriate for this building. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-yourbox)
  5. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or northwest out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxesfor-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.