Council planning record

Single storey rear and side extension

44 OAKMOUNT ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2LL

Decided PermitReference: H/22/93999Eastleigh Borough Council

Last published check: 9 Oct 2026, 14:33. Check the council record for more recent changes.

Application location

44 OAKMOUNT ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 2LL

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
17 Oct 2022
Validated
18 Oct 2022
Determination deadline
13 Dec 2022
Local authority
Eastleigh Borough Council

Application overview

Single storey rear and side extension

Proposal details

Reference
H/22/93999
Alternative references
11624774
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
Coast Architecture Ltd (Mr Nicholas Jenkins)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
H_22_93999 Delegated Officer ReportOfficer Report · PDF8 Dec 2022View
H_22_93999 PL_Final DecisionDecision Notice · PDF8 Dec 2022View
Existing Elevations, Floor and Block PlansPlans · PDF17 Oct 2022View
Proposed Floor, Elevations and Block PlansPlans · PDF17 Oct 2022View
Application Form RedactedApplication Form · PDF17 Oct 2022View
Location PlanLocation Plan · PDF22 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93999 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 001, 101 and LOC01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (February 2019), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.