Council planning record

First floor side extension over garage space with internal alterations, changes to fenestration on rear ground floor elevations

3 PRECOSA ROAD, BOTLEY, SOUTHAMPTON, SO30 2NW

Decided PermitReference: H/22/93749Eastleigh Borough Council

Application location

3 PRECOSA ROAD, BOTLEY, SOUTHAMPTON, SO30 2NW

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
5 Sept 2022
Validated
5 Sept 2022
Determination deadline
18 Nov 2022
Local authority
Eastleigh Borough Council

Application overview

First floor side extension over garage space with internal alterations, changes to fenestration on rear ground floor elevations

Proposal details

Reference
H/22/93749
Alternative references
11490256
Ward
Botley Ward
Parish
Botley CP
Agent
JLRW Architecture (Richard Williams)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_22_93749 PL_Final DecisionDecision Notice · PDF15 Nov 2022View
H_22_93749 Delegated Officer ReportOfficer Report · PDF15 Nov 2022View
Amended part of application formApplication Form · PDF20 Oct 2022View
Certificate B_RedactedSupporting Documents · PDF20 Oct 2022View
Fisher German Consultation ResponseConsultation Response · PDF19 Oct 2022View
Botley Parish Council Consultation ResponseConsultation Response · PDF28 Sept 2022View
Existing and Proposed Floor and Elevation Plans · PDF5 Sept 2022View
Location and Block PlansPlans · PDF5 Sept 2022View
Application Form RedactedApplication Form · PDF5 Sept 2022View
Esso Pipeline- Special Requirements Brochure_v21.08 (2)Consultation Response · PDF1 Apr 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93749 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 100 and 101 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to Applicant: Biodiversity enhancement is required. A swift brick or bat brick or tube could be built into the new extension. Since the main part of the extension would be facing north or northeast a swift brick would be more appropriate. A bat box could also be installed on a tree if there is a large enough tree in a suitable position. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.