Council planning record

Two storey rear extension, single storey side extension, proposed full storey extension on top and elevational alterations

GLEN LEA, CHURCH HILL, WEST END, SOUTHAMPTON, SO30 3AT

Decided PermitReference: H/22/93734Eastleigh Borough Council

Application location

GLEN LEA, CHURCH HILL, WEST END, SOUTHAMPTON, SO30 3AT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
1 Sept 2022
Validated
1 Sept 2022
Determination deadline
24 Mar 2023
Local authority
Eastleigh Borough Council

Application overview

Two storey rear extension, single storey side extension, proposed full storey extension on top and elevational alterations

Proposal details

Reference
H/22/93734
Alternative references
11515923
Ward
West End South Ward
Parish
West End CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
Decision NoticeDecision Notice · PDF23 Mar 2023View
Officer ReportOfficer Report · PDF21 Mar 2023View
Updated Ecology ResponseConsultation Response · PDF2 Mar 2023View
Preliminary Bat Roost AssessmentEcological Assessment · PDF22 Feb 2023View
AMENDED Existing Elevations and Floor PlansElevations And Floor Plan · PDF24 Oct 2022View
AMENDED Proposed Elevations and Floor PlansElevations And Floor Plan · PDF24 Oct 2022View
SUPERSEDED Existing Elevations and Floor PlansElevations And Floor Plan · PDF19 Oct 2022View
SUPERSEDED Proposed Elevations and Floor PlansElevations And Floor Plan · PDF19 Oct 2022View
Tree Consultation ResponseConsultation Response · PDF18 Oct 2022View
Ecology response H 22 93734 GLEN LEA, CHURCH HILL, WEST ENDConsultee Response5 Oct 2022View
Application Form RedactedApplication Form · PDF1 Sept 2022View
SUPERSEDED Existing Elevations, Floor, Block and Location PlansPlans · PDF1 Sept 2022View
Existing Block PlanBlock Plan · PDF1 Sept 2022View
SUPERSEDED Proposed Elevations and Floor PlansElevations And Floor Plan · PDF1 Sept 2022View
Proposed Block PlanBlock Plan · PDF1 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01 - Existing Block Plan 02 Rev B - Existing Elevations and Floor Plans 03 Rev D - Proposed Elevations and Floor Plans 04 - Proposed Block Plan Reason: For the avoidance of doubt and in the interests of proper planning
  2. The development hereby permitted shall start no later than three years from the date of this decision Reason: To comply with Section 91 of the Town and Country Planning Act 1990
  3. Not withstanding the approved plan 03 Rev D, no development shall start until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details Reason: To ensure a satisfactory visual appearance in the interest of amenities
  4. The development must accord with the arboricultural report reference 23_5837_02_32. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. No development shall start until a bat roost mitigation and enhancement plan designed by a bat-licensed ecologist detailing 4no. compensatory bat roosts must be added to the new extension. These bat roosts should be located as close as possible to the location and design of the original bat roosting features identified in the Enims – Preliminary Bat Roost Assessment – Appendix B, pages 16 and 17 – November 2022. Reason: To protect bats and restore original bat roost features
  6. The second floor window on the north-western elevation [as marked on the approved plan 03 Rev D] serving the ensuite, dressing room and master bedroom shall be obscured glazed to Pilkingtons level 3 or equivalent with no more than a top opening toplight Reason: To protect the amenity and privacy of the adjoining residential properties
  7. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  8. Note to Applicant: There is a record of bats near this property. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  9. Note to Applicant: Biodiversity enhancements are required. Suitable recommendations should be included in the ecological assessment report. Bat bricks or swift bricks may be appropriate. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.