Council planning record

First floor side/rear extension following demolition of existing single storey side element, single storey rear extension, alteration to existing porch, removal of existing carport within driveway to reduction to front garden levels to provide car parking, bike storage and planting areas, alteration to fenestration and new entrance steps

113 UNDERWOOD ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6FX

Decided PermitReference: H/22/93515Eastleigh Borough Council

Application location

113 UNDERWOOD ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6FX

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 Jul 2022
Validated
4 Aug 2022
Determination deadline
29 Sept 2022
Local authority
Eastleigh Borough Council

Application overview

First floor side/rear extension following demolition of existing single storey side element, single storey rear extension, alteration to existing porch, removal of existing carport within driveway to reduction to front garden levels to provide car parking, bike storage and planting areas, alteration to fenestration and new entrance steps

Proposal details

Reference
H/22/93515
Alternative references
11434961
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
J Design & Planning Ltd (Mr John Essex)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
Officer ReportOfficer Report · PDF29 Sept 2022View
Decision NoticeDecision Notice · PDF29 Sept 2022View
GISConsultation Response · PDF30 Aug 2022View
Southern Water LetterConsultation Response · PDF30 Aug 2022View
Ecology ResponseConsultation Response · PDF25 Aug 2022View
Location & Block PlanPlans · PDF27 Jul 2022View
Application Form RedactedApplication Form · PDF27 Jul 2022View
Existing & Proposed Elevation & Floor PlansElevations And Floor Plan · PDF27 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 409_03 and 409_04 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. During construction, if grass snakes, slow worms or common toads are found, to avoid harm, they should not be handled but be allowed to move away from the construction area on their own. Construction materials must not be left in piles in the rear garden, so they do not attract grass snakes, slow worms, or toads to shelter in them. If any compost heaps need to be moved to enable the works, they must be dismantled by hand to ensure that grass snakes, slow worms or toads will not be harmed. Any excavations or pipes must either be covered at night or fitted with a small animal escape ramp to allow any animals that fall in to escape on their own. Reason: To avoid harm to protected species of reptiles and amphibians. Please could you add the following informative to the decision letter: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-withbats/ive-found-a-bat-during-works. Biodiversity enhancements will be required. Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxesfor-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm The addition of a swift nest box might be a reasonable enhancement. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ). (Bat boxes should face south, south east or south west, so may not be possible on this site.)
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.