Council planning record

Flat roof single storey side extension

35 DAKOTA WAY, EASTLEIGH, SO50 5TY

Decided PermitReference: H/22/93451Eastleigh Borough Council

Application location

35 DAKOTA WAY, EASTLEIGH, SO50 5TY

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
18 Jul 2022
Validated
18 Jul 2022
Determination deadline
27 Sept 2022
Local authority
Eastleigh Borough Council

Application overview

Flat roof single storey side extension

Proposal details

Reference
H/22/93451
Alternative references
11397218
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
Light House Studio (Ms Rachael Smith)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
H_22_93451 PL_Final DecisionDecision Notice · PDF27 Sept 2022View
Officer ReportOfficer Report · PDF26 Sept 2022View
Ecology commentsConsultation Response · PDF15 Aug 2022View
HP Planning Conveyencing LetterConsultation Response · PDF22 Jul 2022View
Existing Ground Floor Plan.pdfFloor Plan · PDF18 Jul 2022View
Proposed Roof PlaRoof Plan · PDF18 Jul 2022View
Proposed Site PlanSite Layout Plan · PDF18 Jul 2022View
Proposed Sections PlanSection Plan · PDF18 Jul 2022View
Existing Elevations PlanElevations Plan · PDF18 Jul 2022View
Proposed Ground Floor PlanFloor Plan · PDF18 Jul 2022View
Location Plan.pdfLocation Plan · PDF18 Jul 2022View
Existing Roof Plan.pdfRoof Plan · PDF18 Jul 2022View
Existing Sections.pdfSection Plan · PDF18 Jul 2022View
Existing Site Plan.pdfSite Layout Plan · PDF18 Jul 2022View
Proposed Elevations PlanElevations Plan · PDF18 Jul 2022View
Application Form RedactedApplication Form · PDF18 Jul 2022View
Dig Safely Measures to avoid injury and damage to gas pipes · PDF11 Dec 2017View
Valve safety advice · PDF11 Dec 2017View
Map key · PDF11 Dec 2017View
Know what's below · PDF11 Dec 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93451 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 22008_013A, 22008_103A, 22008_010A, 22008_030A, 22008_001A, 22008_100A, 22008_200A, 22008_003, 22008_300A22008_002A, and 22008_020A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to applicant: There are high pressure pipelines in the vicinity of your proposed work area. For your safety, it is essential that no work or crossing of this high pressure pipeline is carried out until a detailed consultation has taken place. This response is for initial/scoping out work only. This response does not give permission to undertake any work. When consultation has taken place, your planning has been approved and works on site are due to start, another request for information and updated maps must be made via our on-line system as a ‘planned works’ enquiry.
  5. Biodiversity enhancements are required. Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm
  6. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.