Council planning record

Conversion of garage to form habitable space and extended dropped kerb

36 SENGANA CLOSE, BOTLEY, SOUTHAMPTON, SO30 2NU

Decided PermitReference: H/22/93389Eastleigh Borough Council

Application location

36 SENGANA CLOSE, BOTLEY, SOUTHAMPTON, SO30 2NU

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
7 Jul 2022
Validated
18 Jul 2022
Determination deadline
12 Sept 2022
Local authority
Eastleigh Borough Council

Application overview

Conversion of garage to form habitable space and extended dropped kerb

Proposal details

Reference
H/22/93389
Alternative references
11384225
Ward
Botley Ward
Parish
Botley CP
Agent
Coast Architecture Ltd (Mr Nicholas Jenkins)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Officer ReportOfficer Report · PDF12 Sept 2022View
Ecology response (amended)Consultation Response · PDF12 Sept 2022View
H_22_93389 PL_Final DecisionDecision Notice · PDF12 Sept 2022View
AMENDED Plans and Elevations Existing and Proposed · PDF9 Sept 2022View
Parish commentConsultation Response10 Aug 2022View
Ecology responseConsultation Response · PDF2 Aug 2022View
Application Form RedactedApplication Form · PDF7 Jul 2022View
Location PlanLocation Plan · PDF7 Jul 2022View
SUPERSEDED Existing and Proposed Floor, Elevations and Block planPlans · PDF7 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93389 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 001 Rev A and 002 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: The existing Aco drain will be suitable for this small increase in surface water drainage. The slope of the extended driveway must ensure that the surface water will flow towards that existing drain and away from rather than towards the house. The previous surface of fake grass would have allowed surface water to drain through it. The area of new planting next to the house is fine, but should not be designed to collect surface water, because if the soil becomes saturated the water will have nowhere else to go and may affect the foundation of the house, which is not acceptable. The area of new planting should be planted with flowering plants to attract pollinators as a biodiversity enhancement.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.