Council planning record

Single Storey Rear Extension

76 ASHTON GARDENS, EASTLEIGH, SO50 4DG

Decided PermitReference: H/22/93360Eastleigh Borough Council

Application location

76 ASHTON GARDENS, EASTLEIGH, SO50 4DG

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
4 Jul 2022
Validated
16 Aug 2022
Determination deadline
14 Oct 2022
Local authority
Eastleigh Borough Council

Application overview

Single Storey Rear Extension

Proposal details

Reference
H/22/93360
Alternative references
11372911
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
Ashplan (Graham Ash)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
H_22_93360 PL_Final DecisionDecision Notice · PDF13 Oct 2022View
Officer ReportOfficer Report · PDF12 Oct 2022View
Ecology ResponseConsultation Response · PDF1 Sept 2022View
Application Form RedactedApplication Form · PDF4 Jul 2022View
Proposed Elevation Floor & Roof PlansPlans · PDF4 Jul 2022View
Elevations Plan (1885357)Elevations Plan · PDF24 Feb 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93360 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 17-009-02, 17-009-03 and 17-009-01 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-withbats/ive-found-a-bat-during-works. Biodiversity enhancement is required. A swift nest box mounted on the house would be a suitable enhancement. Further information is available at https://www.hampshireswifts.co.uk/nesting and https://www.swift-conservation.org/OurLeaflets.htm . If this is not possible, other enhancements can be considered.
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.