Council planning record

Proposed single storey ground floor rear extension to replace the existing conservatory to kitchen/diner and join onto the existing kitchen extension building. Flat roof.

20 STOKE COMMON ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6DU

Decided PermitReference: H/22/93321Eastleigh Borough Council

Application location

20 STOKE COMMON ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6DU

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
27 Jun 2022
Validated
12 Jul 2022
Determination deadline
26 Sept 2022
Local authority
Eastleigh Borough Council

Application overview

Proposed single storey ground floor rear extension to replace the existing conservatory to kitchen/diner and join onto the existing kitchen extension building. Flat roof.

Proposal details

Reference
H/22/93321
Alternative references
11134490
Ward
Bishopstoke Ward
Parish
Bishopstoke CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
H_22_93321 PL_Final DecisionDecision Notice · PDF23 Sept 2022View
Officer ReportOfficer Report · PDF22 Sept 2022View
Ecology commentsConsultation Response · PDF15 Sept 2022View
Location PlanLocation Plan · PDF12 Jul 2022View
Proposed North South Elevation PlansElevations Plan · PDF27 Jun 2022View
Application Form RedactedApplication Form · PDF27 Jun 2022View
Existing North and South Elevations PlansElevations Plan · PDF27 Jun 2022View
Existing and Proposed Roof PlansRoof Plan · PDF27 Jun 2022View
Proposed East Elevations PlanElevations Plan · PDF27 Jun 2022View
Exsisting East Elevation.pdf · PDF27 Jun 2022View
Site PlanSite Layout Plan · PDF27 Jun 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93321 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Loc 01, 003, 005, 0004, 0006, 0007, 001EE, 0001 and 0002, Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to applicant: To ensure that no potential bat features would be impacted by the proposals, any scaffolding erected can be no higher than the existing conservatory roof level. As an additional precaution against disturbance due to demolition and construction, works affecting the wall where the extension connects to the house should take place outside of active bat season (i.e. can be done between October and April). Any new lighting must be focussed away from this area or any other potential bat roost features and hooded or baffled to ensure minimal light spillage. Lamps of greater than 2000 lumens (150 W) must not be installed. Biodiversity enhancement is required. This could consist of a bat box or a swift box attached to another suitable part of the house, or adding more plants for pollinators to the garden. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, planting for bats https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-help-birds/nestboxes/nestboxes-for-small-birds/
  5. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.