Council planning record

Single storey rear extension and internal alterations

27 DERBY ROAD, EASTLEIGH, SO50 5FD

Decided PermitReference: H/22/93157Eastleigh Borough Council

Application location

27 DERBY ROAD, EASTLEIGH, SO50 5FD

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
30 May 2022
Validated
8 Jun 2022
Determination deadline
3 Aug 2022
Local authority
Eastleigh Borough Council

Application overview

Single storey rear extension and internal alterations

Proposal details

Reference
H/22/93157
Alternative references
11283107
Ward
Eastleigh South Ward
Parish
Eastleigh Town CP
Agent
studioAH Architects (Mr Abdul Hasnath)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
H_22_93157 PL_Final DecisionDecision Notice · PDF3 Aug 2022View
H_22_93157 Delegated Officer ReportOfficer Report · PDF3 Aug 2022View
Ecology Consultation ResponseConsultation Response · PDF18 Jul 2022View
Southern Water Consultation ResponseConsultation Response · PDF5 Jul 2022View
Southern Water GIS MapConsultation Response · PDF5 Jul 2022View
Proposed ElevationsElevations Plan · PDF30 May 2022View
Application Form RedactedApplication Form · PDF30 May 2022View
Existing and Proposed Roof PlansPlans · PDF30 May 2022View
Proposed Ground and Floor PlansPlans · PDF30 May 2022View
Existing Floor and Elevations PlansPlans · PDF30 May 2022View
Location PlanLocation Plan · PDF30 May 2022View
Site PlanBlock Plan · PDF30 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93157 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 001, 002, 100, 101, 110 and 111 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  5. Note to Applicant: The applicant is advised that biodiversity enhancement is required. A bat box or a swift nest box could be installed. House sparrows will use swift nest boxes if swifts are not using them. Further information is available at https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes and https://www.hampshireswifts.co.uk/nesting. In addition, no scaffolding shall lean against the building in the vicinity of the upper storey windows.
  6. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site.
  7. Note to Applicant: Your property is understood to have a restrictive covenant which prevents any additions or alterations to the property without consent of the Council, this is in addition to planning permission consent. You will therefore need to contact Asset Management - asset.management@eastleigh.gov.uk directly to obtain their consent prior to proceeding with the approved planning application under application H/22/93157.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (February 2019), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.