Council planning record

single storey side extension and enlarged porch

14 ROYSTON AVENUE, EASTLEIGH, SO50 4NJ

Decided PermitReference: H/22/93106Eastleigh Borough Council

Application location

14 ROYSTON AVENUE, EASTLEIGH, SO50 4NJ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
23 May 2022
Validated
13 Jun 2022
Determination deadline
8 Nov 2022
Local authority
Eastleigh Borough Council

Application overview

single storey side extension and enlarged porch

Proposal details

Reference
H/22/93106
Alternative references
11268318
Ward
Eastleigh North Ward
Parish
Boyatt Wood CP
Agent
Mr Craig Roppolo

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_22_93106 PL_Final DecisionDecision Notice · PDF3 Nov 2022View
H_22_93106 Delegated Officer ReportOfficer Report · PDF2 Nov 2022View
Southern Water letterConsultation Response · PDF22 Sept 2022View
Southern Water GISConsultation Response · PDF22 Sept 2022View
AMENDED Proposed ElevationsElevations Plan · PDF8 Sept 2022View
AMENDED Proposed floor plan and roof planFloor Plan · PDF8 Sept 2022View
Location PlanLocation Plan · PDF13 Jun 2022View
Existing Roof & Floor PlanPlans · PDF9 Jun 2022View
Application Form RedactedApplication Form · PDF23 May 2022View
Existing Elevations PlanElevations Plan · PDF23 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93106 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 03 - 03/22/A, 04/03/22/A, LOC 01, 02 -03/22 and 01 -03/22 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: Bats and nesting birds are protected under the Wildlife and Countryside Act 1981, as amended (section 1). It is an offence to remove, damage or destroy the nest of any wild bird while that nest is in use or being built. Bats are protected from disturbance, harm, obstruction of or destruction of their roosting places.
  5. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  6. Note to Applicant: If evidence of an active bird’s nest is found during construction, work must stop and a 5 m buffer must be erected around the nest to protect it from disturbance until after the chicks have fledged and left the nest.
  7. Note to Applicant: Biodiversity enhancement is required. It is recommended to install a built in or externally mounted bat tubes/bricks or swift bricks/nest boxes into the gable end of the new extension. Built in roosting/nesting opportunities are preferred to externally mounted boxes because they can’t fall off and do not require maintenance. Additional information is available on the Hampshire Swifts website https://www.hampshireswifts.co.uk/nesting and the Bat Conservation Trust website https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes ; and https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes/external-ready-made-bat-boxes-integrated-bat-boxes.
  8. Note to Applicant: Southern Water requires a formal application for any new connection to the public sewer to be made by the applicant or developer. To make an application visit Southern Water's Get Connected service: developerservices.southernwater.co.uk and please read the New Connections Charging Arrangements documents which are available on the website via the following link: southernwater.co.uk/developing-building/connection-charging-arrangements
  9. Note to Applicant: It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site. For further advice, please contact Southern Water, Southern House, Yeoman Road, Worthing, West Sussex, BN13 3NX (Tel: 0330 303 0119). Website: southernwater.co.uk or by email at: SouthernWaterPlanning@southernwater.co.uk
  10. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (February 2019), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.