Council planning record

Single Storey Rear Extension, First Floor Dormer and Alterations including additional front door

4 THURSTON CLOSE, CHANDLER'S FORD, EASTLEIGH, SO53 2QG

Decided PermitReference: H/22/93061Eastleigh Borough Council

Application location

4 THURSTON CLOSE, CHANDLER'S FORD, EASTLEIGH, SO53 2QG

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
16 May 2022
Validated
27 May 2022
Determination deadline
2 Sept 2022
Local authority
Eastleigh Borough Council

Application overview

Single Storey Rear Extension, First Floor Dormer and Alterations including additional front door

Proposal details

Reference
H/22/93061
Alternative references
11261101
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
AJ Design (Mr Andrew Johns)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
H_22_93061 PL_Final DecisionDecision Notice · PDF30 Aug 2022View
H_22_93061 Delegated Officer ReportOfficer Report · PDF26 Aug 2022View
Proposed ElevationsElevations Plan · PDF27 May 2022View
Proposed Ground Floor PlanFloor Plan · PDF27 May 2022View
Existing Elevation PlanElevations Plan · PDF26 May 2022View
Location and Site PlansPlans · PDF24 May 2022View
Existing Ground Floor PlanFloor Plan · PDF24 May 2022View
Existing First Floor PlanFloor Plan · PDF24 May 2022View
Proposed First Floor PlanFloor Plan · PDF24 May 2022View
Application Form RedactedApplication Form · PDF16 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
H_22_93061 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: D, E, A, B, C, F and G Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed in the application form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. Note to Applicant: Construction should take place outside of the main bat activity season which is between May and September to avoid disturbance to bats roosting behind the cladding on the front elevation. The council must be notified if plans change. Please also note a license from Natural England would be required for any works to the front elevation.
  5. Note to Applicant: All bats and their roosts are protected by law in the UK. Even though the rear elevation will not be directly affected by the works, the noise, vibrations, and dust generated during construction could affect bats sleeping during the daytime. Workers must remain vigilant of the potential presence of bats, not obstruct their roosts or do anything that could cause harm to a bat. If bats or any signs of bats are found during construction, all work must stop immediately, and Natural England must be called. The Bat Conservation Trust website ( https://www.bats.org.uk/ ) explains why bats are protected and what to do if you find a bat at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  6. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (February 2019), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.