Council planning record

Two storey side extension, front porch extension and single storey rear extension.

16 EPSOM CLOSE, HORTON HEATH, EASTLEIGH, SO50 7NZ

Decided PermitReference: H/22/93048Eastleigh Borough Council

Application location

16 EPSOM CLOSE, HORTON HEATH, EASTLEIGH, SO50 7NZ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Householder planning
Received
12 May 2022
Validated
8 Jun 2022
Determination deadline
14 Oct 2022
Local authority
Eastleigh Borough Council

Application overview

Two storey side extension, front porch extension and single storey rear extension.

Proposal details

Reference
H/22/93048
Alternative references
11250921
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
DWG Plans (Mr Paul Blay)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
Committee ReportOfficer Report · PDF14 Oct 2022View
Decision NoticeDecision Notice · PDF14 Oct 2022View
Street Scene PlanStreet Scene Plan1 Sept 2022View
Site PlanSite Layout Plan · PDF1 Sept 2022View
Proposed rendersIllustration · PDF1 Sept 2022View
Proposed floor and roof plansFloor Plan · PDF1 Sept 2022View
Neighbours Comment RedactedNeighbour Correspondence · PDF24 Jun 2022View
Neighbours Comment RedactedNeighbour Correspondence · PDF24 Jun 2022View
Existing Floor and Roof PlanPlans · PDF24 May 2022View
Existing RendersIllustration · PDF24 May 2022View
Proposed Elevations PlanElevations Plan · PDF24 May 2022View
Existing Elevations PlanElevations Plan · PDF24 May 2022View
Application Form RedactedApplication Form · PDF12 May 2022View
Location planLocation Plan · PDF31 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans: Location plan (05), Site Plan (01668 Rev B), Existing Floor and Roof Plan (01802 Rev A), Existing Elevations Plan (01803 Rev A), Proposed floor and roof plans (01805 Rev B) and Proposed Elevations Plan (01806 Rev A). Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  5. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  6. No construction shall start until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. This shall include details and timings of deliveries, protective measures to safeguard the cul-de-sac from construction traffic, access and parking arrangements for construction vehicles and measures for minimising dust and mud on the surrounding roads. Construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  7. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  8. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  9. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.