ApprovedCouncil status: Decided Permit

Two storey side and rear extension and single storey rear extension

37 KINGSWAY GARDENS, CHANDLER'S FORD, EASTLEIGH, SO53 1FF

Eastleigh Borough CouncilReference H/17/80437Householder planning

Last published check: 12 Nov 2026, 19:12. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 19:12 (UK)

  1. DoneReceived11 Apr 2017
  2. DoneValidated11 Apr 2017
  3. ClosedConsultationEnded 22 Jun 2017
  4. Date set by councilTarget decision date24 Aug 2017
  5. DecidedPermit23 Aug 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Householder planning
Ward
Hiltingbury East
Parish
Chandlers Ford CP
Documents
27 published

Proposal

Two storey side and rear extension and single storey rear extension

Reference
H/17/80437
Ward
Hiltingbury East
Parish
Chandlers Ford CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • H_17_80437 PL_Final DecisionDecision Notice23 Aug 2017View
  • officer ReportOfficer Report22 Aug 2017View
  • Photo418 Aug 2017View
  • Photo118 Aug 2017View
  • Photo518 Aug 2017View
  • Photo618 Aug 2017View
  • Photo218 Aug 2017View
  • Photo318 Aug 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
H_17_80437 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: Site Location Plan, 116/PL/02 Rev.01, 116/PL/03 Rev.01, 116/PL/04 Rev.01, 116/PL/05, 116/PL/06 Rev.01, 116/PL/08 Rev.01, 116/PL/09 Rev.01, 116/PL/10 Rev.01 and 116/PL/11 Rev.01 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing dwelling. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The development hereby permitted shall not be brought into use until car parking has been constructed, surfaced and marked out in accordance with the approved plan: 116/PL/10 Rev.01. The approved parking area shall not thereafter be used for any purpose other than the turning, parking, loading and unloading of vehicles. Reason: To make provision for off street parking for the purpose of highway safety.
  5. The Tree Protection Plan must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. No access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the fenced area. Tree protection measures shall be retained in their approved form for the duration of the work. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality.
  6. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  7. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
  8. Note to Applicant: The application site lies on the location of a former nursery. The presence of 'made ground' and / or contaminants in the ground cannot be ruled out and therefore we would recommend that the risks to the development be considered. In addition, we would recommend that this is brought to the attention of the Building Control Officer. Should any information come to light during the demolition or construction works that indicates the presence, or the possible presence of, 'made ground' or of contaminated soils, then this should be brought to the attention of the Environmental Health Service. Any excavated material is to be disposed in the appropriate manner and not to be reused on site, unless proven to be 'free' from chemical contamination.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.