Council planning record

Erection of 1no. industrial storage building and associated yard (Use Class B8), following demolition of existing barn.

Barn Opposite Stroudwood Nursery, Stroudwood Lane, Upham, SO32 1HG

ValidReference: F/26/101528Eastleigh Borough Council

Application location

Barn Opposite Stroudwood Nursery, Stroudwood Lane, Upham, SO32 1HG

This record has no verified map location.

Application summary

Status
Valid
Application type
Full planning
Received
5 Jun 2026
Validated
25 Jun 2026
Determination deadline
20 Aug 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of 1no. industrial storage building and associated yard (Use Class B8), following demolition of existing barn.

Proposal details

Reference
F/26/101528
Alternative references
14988925
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Mr Jacob Goodenough

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
Highway AuthorityConsultation Response · PDF10 Sept 2026View
Landscape OfficerConsultation Response · PDF27 Aug 2026View
Soil permeability reportDrainage Report · PDF25 Aug 2026View
Swept path tracking planPlan · PDF25 Aug 2026View
Proposed location and site planLocation Plan · PDF25 Aug 2026View
Tree OfficerConsultee Response · PDF8 Jul 2026View
Landscape OfficerConsultation Response · PDF8 Jul 2026View
Highways Officer (HCC)Consultation Response · PDF6 Jul 2026View
Ecology OfficerConsultee Response · PDF2 Jul 2026View
BNG metric Stroudwood Lane - updated Apr 26Ecological Assessment25 Jun 2026View
Planning, Design and Access StatementDesign And Access Statement · PDF5 Jun 2026View
BNG Habitat Management & Monitoring PlanSupporting Documents · PDF5 Jun 2026View
Existing ElevationsElevations Plan · PDF5 Jun 2026View
Drainage DocumentationDrainage Report · PDF5 Jun 2026View
Tree SurveyTree Info · PDF5 Jun 2026View
Proposed ElevationElevations Plan · PDF5 Jun 2026View
Floor Plan - ExistingFloor Plan · PDF5 Jun 2026View
Preliminary Ecological Appraisal - FinalSupporting Documents · PDF5 Jun 2026View
Transport AssessmentTransport Assessment · PDF5 Jun 2026View
Application Form RedactedApplication Form · PDF5 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Not yet determined
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: A24895(1.0)100revE, A24895(1.0)101revE, 1N444_PL02revA, N444_PL01revD, NJC-001revC Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The development must accord with the arboricultural report reference 241653 – AIA 2. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality.
  4. No excavation, demolition or development related works shall commence until a precautionary working methods statement has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To protect badgers and other terrestrial mammal during the demolition and construction works.
  5. No development shall commence until a landscaping, planting and maintenance scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover details of the soft landscape areas, timber gate, timber fencing and surfacing materials for the car parking area. The development shall be carried out in accordance with the approved details, which shall be fully implemented before the development is brought into use. Reason: To provide an appropriate setting for the building, which is within an area of countryside.
  6. The car park shall not be constructed until the drainage has been installed in accordance with the approved drainage letter by Aqua Callidus (dated 25th August 2026) and drainage layout plan ACC-24185-01revA. Reason: To ensure satisfactory drainage for the site.
  7. The development shall not be brought into use until a Delivery Vehicle Strategy Plan has been submitted to and approved in writing by the Local Planning Authority. The strategy plan must include a requirement for vehicle exceeding 3.5 tonnes to access the site from Mortimers Lane, the positioning/ opening of entrance gates and surfacing of the entrance to ensure mud is not transferred onto the highway. The development shall accord with the approved details. Reason: In the interests of the safety and movement of vehicles on the highway.
  8. The materials to be used in the construction of the external surfaces of the development hereby permitted shall use anthracite grey metal cladding. Reason: To ensure a satisfactory visual appearance for the countryside location.
  9. The development shall accord with the preliminary ecological assessment by ecosupport (April 2026). Unless otherwise stated in the report, all ecological enhancements shall be fully implemented by the end of the first planting season following completion of the development. Reason: In the interests of ecology. Environment Act 2021
  10. The development shall accord with the BNG Habitat Management and Monitoring Plan by ecosupport (April 2026) and shall be managed and maintained for a minimum period of 30 years following completion of the development. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 and to accord with the Environment Act 2021, Schedule 14.
  11. No vehicle greater than a 10m 3 axle rigid lorry shall be permitted onto the site. Reason: In the interests of highway safety.
  12. Note to Applicant: In accordance with Policy DM3(1)(a) of the National Planning Policy Framework (August 2026), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.