Council planning record

Modular Classroom building for Special Educational Needs and Disabilities (SEND), with associated landscaping

BOORLEY PARK PRIMARY SCHOOL, NAIRN ROAD, BOTLEY, SOUTHAMPTON, SO32 2SH

Decided PermitReference: F/26/101341Eastleigh Borough Council

Application location

BOORLEY PARK PRIMARY SCHOOL, NAIRN ROAD, BOTLEY, SOUTHAMPTON, SO32 2SH

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
30 Apr 2026
Validated
14 May 2026
Determination deadline
9 Jul 2026
Local authority
Eastleigh Borough Council

Application overview

Modular Classroom building for Special Educational Needs and Disabilities (SEND), with associated landscaping

Proposal details

Reference
F/26/101341
Alternative references
14520076
Ward
Botley Ward
Parish
Botley CP
Agent
ACM Architects Ltd (Mr Alan MacLean)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 17 of 17

DocumentPublishedAction
F_26_101341 PL_Final DecisionDecision Notice · PDF22 Jun 2026View
F_26_101341 Delegated Officer Report Boorley Park SchoolOfficer Report · PDF22 Jun 2026View
NatureSpace commentsConsultation Response · PDF9 Jun 2026View
Highway Authority commentsConsultation Response · PDF4 Jun 2026View
Botley Parish Council commentsConsultation Response · PDF3 Jun 2026View
Ecology response for F 26 101341 BOORLEY PARK PRIMARY SCHOOL, NAIRN ROAD, BOTLEYConsultee Response · PDF1 Jun 2026View
Sport England responseConsultation Response · PDF27 May 2026View
Urban Design commentsConsultation Response · PDF27 May 2026View
Landscape Officer commentsConsultation Response · PDF27 May 2026View
Proposed Floor and External Areas PlansPlans · PDF13 May 2026View
Biodiversity Net GainSupporting Documents13 May 2026View
Preliminary Ecological Appraisal Survey ReportEcological Assessment · PDF13 May 2026View
Biodiversity Gain PlanSupporting Info · PDF13 May 2026View
Proposed Site Layout, Ground Floor Plans and ElevationsPlans · PDF13 May 2026View
Proposed Block and Location PlansPlans · PDF13 May 2026View
Application Form RedactedApplication Form · PDF30 Apr 2026View
Design and Access StatementDesign And Access Statement · PDF30 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_26_101341 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 2605-02-01A (Proposed Location & Block Plans)03-22B (Proposed Site Layout Plan & Elevations)03-23B (Proposed Floor Plan and External Areas) Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Planning Authority, which shall include: (a) A programme and methods of construction work; (b) The provision of long term facilities for contractor parking; (c) The arrangements for deliveries associated with all construction works, with special regard to school timings; (e) Access and egress for plant and machinery; (f) Protection of pedestrian routes during construction; (g) Location of temporary site buildings, compounds, construction material, and plant storage areas; (h) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail; (i) Precautionary construction phase measures to avoid harm to wildlife as set out in paragraph 6.6 of the Preliminary Ecological Appraisal Survey Report (Vesper Conservation & Ecology Limited, 12/05/2026). Construction work shall only take place in accordance with the approved CEMP. Reason: In order to minimise amenity impacts and ensure protected species are not harmed, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  4. Prior to implementation of the ecological enhancements outlined in paragraph 6.9 of the Ecological Appraisal Survey Report (Vesper Conservation & Ecology Limited, 12/05/2026) a plan showing their locations shall be submitted to and approved in writing by the Local Planning Authority. The ecological enhancements shall thereafter be implemented in accordance with the Report and approved plan. Reason: To achieve biodiversity enhancements in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  5. a) Prior to commencement of the development hereby permitted, a scheme for hard and soft landscaping, to include planting plans, shall be submitted to and approved in writing by the Local Planning Authority; b) The landscaping scheme shall thereafter be carried out in accordance with the approved plan and planting details in the first planting season following occupation of the development, or completion of the development (whichever is sooner); c) If, within a period of 10 years after planting, any tree or plant is removed, dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged, defective or diseased, another tree or plant of the same species and size as that originally approved shall be planted at the same place within the next planting season, unless the Local Planning Authority gives its written consent to any variation. Reason: To achieve a high quality development and to support biodiversity, in accordance with policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  6. Prior to installation of the boundary fencing, full details of the type and colour treatment shall be submitted to and approved in writing by the Local Planning Authority. The fencing shall thereafter be installed in accordance with the approved details. Reason: In the interest of visual amenity and security, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  7. Conditions to comply with the Environment Act (2021) The development must adhere to the Biodiversity Gain Plan for Boorley Park School, received on 13/05/2026, which has been submitted to and approved by the Local Planning Authority in accordance with paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990, and shall be implemented in accordance with the approved details, to include management and maintenance of habitats for a minimum period of 30 years following completion. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2, Schedule 7A of the Town and Country Planning Act 1990, policy DM11 of the Eastleigh Borough Local Plan (2016-2036), and the Environment Act 2021, schedule 14.
  8. Notice in writing shall be given to the Local Planning Authority when the: a) Habitat creation and enhancement works set out in the Biodiversity Gain Plan for Boorley Park School, received on 13/05/2026 have commenced, and; b) Habitat creation and enhancement works as set out in the Biodiversity Gain Plan for Boorley Park School, received on 13/05/2026 have been completed. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2, Schedule 7A of the Town and Country Planning Act 1990, policy DM11 of the Eastleigh Borough Local Plan (2016-2036), and the Environment Act 2021, schedule 14.
  9. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.