The development hereby permitted shall be implemented in accordance with the following plans numbered: 100revB, 101revB, 102, 103, 104, 105 & 106revB Reason: For the avoidance of doubt and in the interests of proper planning.
The development shall accord with the following reports: - Arboricultural report by Mark Welby (revision B issued 22nd May 2026 and reference MW.20.0827.AIA) - Biodiversity net gain assessment and Biodiversity net gain metric by South Downs Ecology (version 2 dated 28th July 2026) - Ecological impact assessment by South Downs Ecology (version 2 dated 15th January 2026). Reason: To protect trees and ecology.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials used for the access ramp hereby permitted shall match in type, colour and texture those used on the host building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the arboricultural report (reference MW.20.0827.AIA). Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
The replacement trees shall be planted before the end of the first planting season following the completion of the approved development, in accordance with the approved site plan (drawing:101revB). For a period of no less than 10 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interest of the visual amenity of the locality.
The development shall not be brought into use until a Landscape and Ecology Management Plan (LEMP) has been submitted and approved in writing by the Local Planning Authority. This plan shall include details of any habitat to be created, re-instated, enhanced and retained on site for 30 years; details and extent of new planting; details of maintenance regime and management responsibilities and details of proposed species enhancements. The development shall be carried out in accordance with the approved details. Reason: To ensure that 10% biodiversity net gain is achieved on site and maintained for 30 years in accordance with the Environment Act 2021.
Note to Applicant: In accordance with Policy DM3(1)(a) of the National Planning Policy Framework (August 2026), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.