Council planning record

Erection of 1no. four bedroom detached dwelling with integral garage, associated parking, and bin and bike storage

32 VALLEY ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1GP

Decided PermitReference: F/26/100795Eastleigh Borough Council

Last published check: 14 Oct 2026, 04:16. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
21 Jan 2026
Validated
12 Feb 2026
Determination deadline
9 Apr 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of 1no. four bedroom detached dwelling with integral garage, associated parking, and bin and bike storage

Proposal details

Reference
F/26/100795
Alternative references
14640386
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
ACA Design Limited (Amrik Chahal)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

32 VALLEY ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 1GP

This record has no verified map location.

Documents 13 of 13

DocumentPublishedAction
F_26_100795 PL_Final DecisionDecision Notice · PDF9 Apr 2026View
F_26_100795 Delegated Officer ReportOfficer Report · PDF9 Apr 2026View
Construction Environmental Management Plan (April 2024)Supporting Documents · PDF9 Apr 2026View
HCC Highways commentConsultation Response · PDF25 Feb 2026View
Tree Consultant's commentConsultee Response · PDF25 Feb 2026View
Ecology response for F 26 100795 32 VALLEY ROAD, CHANDLER'S FORDConsultee Response · PDF17 Feb 2026View
Drawings for original building (demolition took place before June 2019)Plans · PDF12 Feb 2026View
Proposed Material ListSupporting Info · PDF12 Feb 2026View
Block, Site Layout, Section, and Elevations (Cycle Store) PlansPlans · PDF21 Jan 2026View
Design & Access StatementDesign And Access Statement · PDF21 Jan 2026View
Proposed Elevations & Floor PlansElevations And Floor Plan · PDF21 Jan 2026View
Tree SurveyTree Info · PDF21 Jan 2026View
Application Form RedactedApplication Form · PDF21 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_26_100795 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: rvr sht 1, 2025/01 Rev D and 2026/01. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The external materials for the dwelling, including all external surfaces, hardstanding, and retaining structures, shall be carried out in accordance with the document titled 'Proposed Material List'. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  3. The raised patio hereby approved shall not be brought into use until details of boundary treatment and any privacy screening along the edges of the raised patio, including those adjacent to neighbouring boundaries, have been submitted to and approved in writing by the Local Planning Authority. The approved boundary treatment shall be installed prior to the first use of the patio and shall thereafter be retained. Reason: To safeguard the amenity of the neighbouring residents.
  4. The development must accord with the arboricultural report reference AIA/AMS-KC/32VALLEY/001 Revision A. No excavation, demolition or development related works shall commence until the tree protection fencing and ground protection has been installed as per the Tree Protection Plan reference TPP-KC/32VALLEY/001. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. The development shall be carried out in accordance with the approved Construction Environmental Management Plan (CEMP) – Rev G. Reason: To minimise the impact of construction on neighbouring amenity, trees and the environment.
  6. All hard and soft landscaping works, together with ecological enhancement measures, shall be carried out in accordance with the approved details. The works shall be completed prior to first occupation or in the first planting season following occupation, whichever is sooner. Any planting which dies, is removed or becomes seriously damaged or diseased within five years shall be replaced. Reason: To ensure a satisfactory setting for the development and biodiversity enhancement.
  7. No external lighting shall be installed other than in accordance with the approved lighting details unless otherwise agreed in writing by the Local Planning Authority. Reason: To protect the amenities of neighbouring occupiers and biodiversity.
  8. The dwelling shall not be first occupied until storage for refuse and recycling and secure covered cycle storage has been provided in accordance with the approved details. The facilities shall thereafter be retained. Reason: To ensure the adequate provision of on site facilities.
  9. The dwelling shall not be first occupied until the parking and turning areas, including the integral garage, have been laid out in accordance with the approved plans. These areas shall thereafter be retained for those purposes, and the garage shall not be used as habitable accommodation. Reason: To ensure adequate parking provision in the interests of highway safety.
  10. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  11. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.