Council planning record

Construction of a standalone container to house batteries associated with storing the solar energy from the solar panels

High Wood Reservoir, Allington Lane, Southampton, SO30 3HQ

Decided PermitReference: F/25/99979Eastleigh Borough Council

Last published check: 13 Oct 2026, 19:15. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
27 Aug 2025
Validated
27 Aug 2025
Determination deadline
26 Nov 2025
Local authority
Eastleigh Borough Council

Application overview

Construction of a standalone container to house batteries associated with storing the solar energy from the solar panels

Proposal details

Reference
F/25/99979
Alternative references
14280525
Ward
West End North Ward
Parish
West End CP
Agent
SLR Consulting (Debra Higginbotham)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

High Wood Reservoir, Allington Lane, Southampton, SO30 3HQ

This record has no verified map location.

Documents 22 of 22

DocumentPublishedAction
F_25_99979 PL_Final DecisionDecision Notice · PDF17 Nov 2025View
F_25_99979 Delegated Officer ReportOfficer Report14 Nov 2025View
Consultation Response Letter from Environment AgencyConsultation Response15 Oct 2025View
Fire Safety Response to Environment AgencySupporting Info · PDF13 Oct 2025View
Environment Agency (response II)Consultation Response24 Sept 2025View
Environmental HealthConsultation Response22 Sept 2025View
Environment Agency (response I)Consultation Response22 Sept 2025View
Natural EnglandConsultation Response · PDF15 Sept 2025View
EBC Asset Management Officer.Consultation Response11 Sept 2025View
Hampshire HighwaysConsultation Response · PDF10 Sept 2025View
Env Health (1)Consultation Response10 Sept 2025View
EcologyConsultee Response · PDF9 Sept 2025View
Application Form RedactedApplication Form · PDF27 Aug 2025View
M7 Container LayoutIllustration · PDF27 Aug 2025View
2016 Rigid Vehicle Egress and Access to Western Approach APPROACHSupporting Info · PDF27 Aug 2025View
High Wood Easement MapSupporting Info · PDF27 Aug 2025View
Planning StatementPlanning Statement · PDF27 Aug 2025View
Access-EgressSupporting Documents · PDF27 Aug 2025View
Location PlanLocation Plan · PDF27 Aug 2025View
Container StructureSupporting Info · PDF27 Aug 2025View
Location PlanLocation Plan · PDF27 Aug 2025View
Portsmouth Water - BESS locationSupporting Documents · PDF27 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_99979 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following approved plans and supporting documents: Location Plan - 2495-110 revision P1 Portsmouth Water Company Owned Land and Easement Plan Proposed BESS container location Container Structure Container Layout Swept Path Analysis - 55/330/1B revision B Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No installation or groundworks shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include precautionary working methods to safeguard wildlife (including reptiles, amphibians and small mammals), details of ecological supervision where appropriate, and measures to prevent pollution or run-off to the adjacent Itchen Valley Country Park SINC. The development shall thereafter be carried out in full accordance with the approved CEMP. Reason: To protect biodiversity and prevent harm to wildlife and adjacent habitats in accordance with Policies DM11 of the Eastleigh Borough Local Plan 2016–2036.
  4. Prior to first operation of the development, a biodiversity enhancement scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall identify appropriate small-scale measures such as native planting, bat or bird boxes, or invertebrate features suited to the site context. The approved measures shall be implemented prior to first operation and retained thereafter. Reason: To secure biodiversity enhancement in accordance with Policy DM11 of the Eastleigh Borough Local Plan 2016–2036.
  5. Prior to the delivery of the battery container, details of the timing, routing, and management of delivery vehicles, including any temporary access arrangements, shall be submitted to and approved in writing by the Local Planning Authority. Deliveries shall thereafter take place in accordance with the approved details. Reason: To ensure safe access and minimise disruption to the highway network in accordance with Policy DM13 of the Eastleigh Borough Local Plan 2016–2036.
  6. The development hereby permitted shall be carried out in accordance with the fire protection and suppression details contained in the submitted documents “BESS Fire Protection Strategy Summary (August 2025)” and “Portsmouth Water – M7 BESS Fire System Details (August 2025)”. The approved fire safety systems shall be installed prior to operation of the development and retained and maintained thereafter. Reason: To ensure appropriate fire safety measures are incorporated in the development in accordance with National Planning Policy Framework (2024).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.